Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 16, 2025 at 8:00 PM
Updated July 17, 2025
Renovation of an educational facility in Cupertino, California. Working plans call for the renovation of a educational facility.
**As of July 16, 2025, bids received were rejected. Project will be rebid but no definite date yet.** Project No: 24175, E076106, 23017-CMS, 23195/BR The Project consists of: Construction of the Cupertino Unified School District (CUSD) Walk-In Cooler and Freezer Project for the following middle schools as indicated in Contract documents. Hyde Middle School, 19325 Bollinger Rd. Cupertino, CA 95014 Miller Middle School, 6151 Rainbow Dr. San Jose, CA 95129 Construction of the Cupertino Union School District (CUSD) Walk-In Cooler and Freezer Project for the following middle schools as indicated in Contract documents To bid on this Project, the Bidder is required to possess one or more of the following State of California contractors license(s): B-General Building Contractor and C-38 (Refrigeration), and/or C38 can be subcontractor to B-General Building Contractor. The Bidder's license(s) must remain active and in good standing throughout the term of the Contract. To bid on this Project, the Bidder is required to be registered as a public works contractor with the Department of Industrial Relations pursuant to the Labor Code Each bid must conform and be responsive to all pertinent Contract Documents, including, but not limited to, the Instructions to Bidders. A bid bond by an admitted surety insurer on the form provided by the District a cashiers check or a certified check, drawn to the order of the Cupertino Union School District, in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the Contract for the Work. The successful Bidder may substitute securities for any monies withheld by the District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. Question Deadline June 15 @ 2:00pm All questions about the meaning or intent of the Contract Documents are to be directed via email to the District to Dana Ino, Director Business Operations ino_dana@cusdk8.org. Work to be done October 1, 2025- March 31, 2026
Final Planning
Educational
$474,306.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 20, 2025
January 16, 2026
Multiple Locations, Cupertino, CA
Related To This Project
Cupertino, CA
Bid Date: Apr 18 2025
Cupertino, CA
Bid Date: May 29 2025
Cupertino, CA
Bid Date: May 29 2025
Cupertino, CA
Bid Date: May 29 2025
Cupertino, CA
Bid Date: Jun 16 2025
Cupertino, CA
Bid Date: Jun 25 2025
Cupertino, CA
--
Cupertino, CA
--
Cupertino, CA
Bid Date: Apr 08 2025
Cupertino, CA
Bid Date: Apr 09 2025
Cupertino, CA
Bid Date: Apr 16 2025
Cupertino, CA
Bid Date: Apr 02 2025
Cupertino, CA
Bid Date: Mar 11 2025
Cupertino, CA
Bid Date: Mar 21 2025
Cupertino, CA
Bid Date: Mar 10 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
