Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 5, 2025 at 8:00 PM

Updated June 6, 2025

Site work and paving for a road / highway in Farmington, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Project consists of the following WORK: site preparation, hauling, masking, installing Onyx FMST, clean up, and testing. -chip seal with fog coat, placing leveling course, deep patching, milling, thin lifts, and raising and lowering manholes and valves to grade. Questions Due Date: Apr 11th 2025, 11:30 PM MDT All questions are to be submitted on the Bonfire website. The Work shall be Finally completed and billed by June 15, 2026

Award

Roads / Highways

$39,394.00

Public - City

Paving, Site Work

7

11

2

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
65
Bidding Soon
1,345
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

May 22, 2025

Project location map

Multiple Locations, Farmington, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed