BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2025 at 8:00 PM

Updated April 4, 2025

Site work and paving for a transportation facility in Birmingham, Alabama. Conceptual plans call for site work for a transportation facility; and for paving for a transportation facility.

The Birmingham Airport Authority (BAA) is soliciting Statements of Qualifications (SOQ) and Project Proposals from qualified engineering firms (firms) to perform civil engineering services for the design phase of the following project at the Birmingham-Shuttlesworth International Airport (BHM): o Northeast Quadrant Grading Improvements See Exhibit A for approximate project limits. The selected firm shall be obligated to perform the necessary work through completion of design, including providing construction ready documents for bidding and a detailed construction cost estimate. The Birmingham-Shuttlesworth International Airport (BHM) serves over 3 million passengers annually. With a 2023 operating revenue of approximately $58 million, BHM is responsible for nearly 2,400 acres of airport property, which includes nearly 1,000 acres within the AOA fence line. BHM is currently served by five major airlines that connect travelers nonstop to 20 airport destinations across the country. BHM also serves as a distribution point for air cargo in Central Alabama, with a total landed weight of nearly 200,000lbs in 2023, while shipping more than 26,000 metric tons of cargo. BHM has two intersecting airline transport category runways: Runway 6/24 and Runway 18/36. Runway 6/24, constructed in the 1950's and extended most recently in 2007 to a total length of 12,007 feet, is the primary runway. Runway 18/36 is the crosswind or secondary runway, with a total length of 7,100 feet. Question Deadline 04/29/2025 All questions associated with this RFQ must be submitted in writing via e-mail to Ed Seoane at eseoane@flybhm.com by the deadline identified for questions/clarifications (see timeline). Questions related to the RFQ directed to any other BAA personnel may be grounds for disqualification. The Birmingham Airport Authority reserves the right to accept or reject any or all proposals; or re-advertise for proposals for the benefit of the BAA. Any proposal that is submitted incomplete, obscure, or contains errors or discrepancies may be cause for rejection. The SOQ / Project Proposalsubmittal shall not include any cost information, such as total cost, cost per hour, work hours, or other pricing data. Any cost information will result in the disqualification of the proposal. Fees will be negotiated with the highest ranked consultant following selection for the project. The method of Contractor Selection has not been Determined at this time. ** RFQ date info : . The electronic copy must be included with the hard copies via a USB flash drive. Deliveries can also be made in-person to the BAA Office located on the ground level of the Terminal Building (located at the above address).

Conceptual

Transportation Terminals

$3,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
56
Bidding Soon
666
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2026

Project location map

5900 Messer Airport Hwy, Birmingham, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.