BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2025 at 8:00 PM

Updated July 3, 2025

Renovation of a fitness / recreation center in Lexington, North Carolina. Working plans call for the renovation of a fitness / recreation center.

As of July 2, 2025, this is only for design. No plans or timeline for construction have been set. Phase 1 will consist of surveying, design of the complex, design of aquatics center, and grading. Phase 2 will consist of finalizing the designs for both the sports complex and aquatics center, finish rough grading, building of sports complex, all fields, pavilion, bathrooms, install storm water & utilities, and install irrigation. Start building aquatics center, start the installation of lights, roads and curbs. Phase 3 will complete the project. Completion of the sports plex, all fields, and aquatics center. Install fencing, bleachers, and playgrounds. Completion of disc gold courses and cross county course. Installation of lights and finalizing utilities. Completion of RV park and asphalt roads and parking lots. The site/address of the Sports Complex shall be close to 411 River Oaks Lane, Lexington NC or GPS coordinates 80.2788033W, 35.6609236N ( -80.2788033 , 35.6609236). This is a 125+/- acre site sitting along Owen Road, Southmont, NC. Please see the current master plan, attached. For all purchasing questions, please contact Dwayne Childress, Support Services Director, County of Davidson at 336-242-2030 There are a few items that need to be taken in account: All building interiors and exteriors will be low to no maintenance. All buildings shall have a metal roof with no flat roofs and no HVAC on roofs. All buildings need to be designed so that maintenance tasks can easily be completed. Phase 1 will consist of surveying, design of the complex, design of aquatics center, and grading. Phase 2 will consist of finalizing the designs for both the sports complex and aquatics center, finish rough grading, building of sports complex, all fields, pavilion, bathrooms, install storm water & utilities, and install irrigation. Start building aquatics center, start the installation of lights, roads and curbs. Phase 3 will complete the project. Completion of the sports plex, all fields, and aquatics center. Install fencing, bleachers, and playgrounds. Completion of disc gold courses and cross county course. Installation of lights and finalizing utilities. Completion of RV park and asphalt roads and parking lots.

Final Planning

Fitness / Rec Centers

$25,000,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
147
Bidding Soon
1,783
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2025

January 1, 2026

Project location map

411 River Oaks Ln, Lexington, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.