Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 4, 2025 at 8:00 PM
Updated April 25, 2025
Renovation of an educational facility in Winter Haven, Florida. Completed plans call for the renovation of a educational facility.
The scope of this project includes making repairs to building 21 (Agriculture Bldg.) damaged by a fire that occurred in the covered workspace area of the building. The repairs will include the replacement of the higher roof, repainting of walls and exposed structure, cleaning the ductwork affected by smoke damage, replacement of the damaged main electrical panels, replace glazing in various windows, and the replacement of lighting and conduits within the work area A non-mandatory pre-proposal meeting will be scheduled, final date and time to be distributed to interested parties through the Building Connected System. All proposals received after 2:00 p.m., of the day specified above, will be returned or left "unopened" in the system. The bid opening is not a public meeting. All Bids shall be valid for acceptance by the Construction Manager for a period of Ninety (90) calendar days following the submittal deadline. All interested subcontractors and vendors must be pre-qualified with JE Dunn or have completed the pre-qualification process within the last year. Subcontractors must submit pre-qualification prior to April 11, 2025 in order to be considered for this project. Pre-qualification information and forms can be obtained through the JE Dunn Construction Registration site located at Website. The Jessica Lunsford Act will be in effect for this project. The project is not subject to the Davis Bacon Act. Polk County Public Schools and JE Dunn Construction are committed to provide equal opportunity and strongly encourage all interested M/WBE and S/LBE firms to submit proposals. Proposal documents will be made available on or about March 31, 2025. Proposal documents will be available via the JE Dunn Construction Building Connected site only. Each pre-qualified subcontractor or vendor will be provided the site log-in. Subcontractors are responsible for all printing and shipping costs if hard copies of the proposal documents are requested. Polk County Public Schools and JE Dunn Construction reserve the right to accept or reject any and all proposals in whole or part and to waive informalities and irregularities. No verbal instruction or directives will be accepted regarding this project during the proposal period. All instructions or directives must be clarified through written Addenda or Supplements. All questions regarding the work should be directed to the Construction Manager, in writing no later than 7 Business Days prior to the Bid Date. The Owner and Architect will not accept calls regarding this project. Dates are subject to change. Please contact Eric DeSmet, Sr. Precon. & Estimating Manager, (813) 220-7459, eric.desmet@jedunn.com with any questions or to request additional information.
Post-Bid
Educational
$7,000,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 24, 2025
May 26, 2025
600 6th St SE, Winter Haven, FL
Related To This Project
Winter Haven, FL
Bid Date: May 15 2025
Winter Haven, FL
Bid Date: Apr 17 2025
Winter Haven, FL
Bid Date: May 27 2025
Winter Haven, FL
Bid Date: Mar 13 2019
Winter Haven, FL
Bid Date: May 15 2025
Winter Haven, FL
Bid Date: May 19 2021
Winter Haven, FL
Bid Date: Aug 22 2025
Winter Haven, FL
Bid Date: May 20 2025
Winter Haven, FL
Bid Date: Jul 31 2025
Winter Haven, FL
--
Winter Haven, FL
--
Winter Haven, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
