BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 21, 2025 at 8:00 PM

Updated May 22, 2025

Site work for a water / sewer project in Tampa, Florida. Completed plans call for site work for a water / sewer project.

Qualified to perform maintenance dredging and first cut dredging of PTBs berths, private terminal berths, and private channels within the port jurisdiction, when requested by PTB. PTB encourages the use of registered Small Business Enterprise (SBE) firms to the greatest extent possible on projects and has a goal of nine percent (9%) SBE participation. PTB will consider SBE participation when evaluating the responses. Questions concerning this Procurement should be directed to Amanda Roche of PTBs Procurement Department, at (813) 905-5008 or by e-mail at aroche@tampaport.com Friday, April 18, 2025 at 5:00 p.m. Respondents Question Deadline Wednesday, April 23, 2025 at 5:00 p.m. PTB Question / Answer Deadline he general scope for Project No. 25-00525 consists of performing maintenance dredging and first cut dredging of Port Tampa Bay's (PTB) berths, private terminal berths, and private channels within the port jurisdiction when requested by PTB. The work to be performed under this contract includes, but is not necessarily limited to, the following: 1. Hydraulic dredging 2. Mechanical dredging 3. Environmental Protection 4. Maintenance and operation of spoil sites during dredging A. This dredge project includes maintenance dredging and some first cut dredging at the Tampa Port Authority. The Base Bid Scope includes dredging 65 deep draft berth locations within the Port area when requested by The Authority. Historically, the Port performs approximately 100,000 cubic yards of dredging each year with each berth typically being maintenance dredged on a three (3) year cycle. The Contract will be for one year with options to extend for two additional years for a maximum duration of three years unless otherwise extended by Port Tampa Bay. The dredging unit prices (items D1- D9) will be good for the Contract duration with the rates adjusted for the 2nd and 3rd year of the Contract based upon the percentage change of the Fuel Index as per Article 7 of the Contract.

Award

Water / Sewer

$5,194,949.00

Public - City

Site Work

3

15

2

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
312
Active Projects
73
Bidding Soon
2,549
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

September 10, 2025

Project location map

To Be Determined, Tampa, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.