BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 6, 2026 at 8:00 PM

Updated July 12, 2026

Site work and new construction of a military facility in Southport, Manitoba. Working plans call for the construction of a 113,021-square-foot, two-story above grade military facility.

Design and construction of the Future Aircrew Training (FAcT) Program infrastructure at Southport Aerospace Centre Inc. The infrastructure will support training of personnel, as well as storage and maintenance of aircraft. Plans include construction of three buildings: 1) A hangar and maintenance facility is developed as a one-story building of non-combustible construction to house the storage and maintenance of multiple aircraft with associated program spaces to include supply storage and warehouse, workshops, vehicle storage, offices, meeting rooms, training rooms and staff support functions. 2) A two-story Training Building will be a non-combustible construction type. The facility will house the classrooms, lockers, auditorium, offices, meeting rooms and staff support functions. The provision of rooftop mechanical platforms, size, and locations will be determined in the detailed design phase. Based on the size of the mechanical platforms, the building may be classified as a three-storey building. 3) A new one-storey Simulator Building is of non-combustible construction. The facility will house the simulators and the associated small and large briefing rooms. The provision of rooftop mechanical platforms, size, and locations will be determined in the detailed design phase. TIMELINE: Project is in design. An Advance Notice has been issued by EllisDon to notify the industry of the upcoming tender opportunity for Early Works Package (A). Early works construction is currently anticipated to commence Fall 2026, with building foundation work to begin early 2028, subject to project approvals. *Construction cost is unreleased.

Pre-Construction/Negotiated

Transportation Terminals

$100,000,000.00

Public - Federal

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
0
Bidding Soon
87
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2026

Project location map

30 Centennaire Dr, Southport, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.