BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2025 at 8:00 PM

Updated April 4, 2025

Site work and new construction of a transportation facility in Southport, Manitoba. Working plans call for the construction of a two-story above grade transportation facility; and for site work for a transportation facility.

Design and construction of the Future Aircrew Training (FAcT) Program infrastructure at Southport Aerospace Centre Inc. The infrastructure will support training of personnel, as well as storage and maintenance of aircraft. Plans include construction of three buildings: 1) A hangar and maintenance facility is developed as a one-story building of non-combustible construction to house the storage and maintenance of multiple aircraft with associated program spaces to include supply storage and warehouse, workshops, vehicle storage, offices, meeting rooms, training rooms and staff support functions. 2) A two-story Training Building will be a non-combustible construction type. The facility will house the classrooms, lockers, auditorium, offices, meeting rooms and staff support functions. The provision of rooftop mechanical platforms, size, and locations will be determined in the detailed design phase. Based on the size of the mechanical platforms, the building may be classified as a three-storey building. 3) A new one-storey Simulator Building is of non-combustible construction. The facility will house the simulators and the associated small and large briefing rooms. The provision of rooftop mechanical platforms, size, and locations will be determined in the detailed design phase. TIMELINE: Project is in development and construction is conditional on the project receiving approval to proceed from the Government of Canada. An Advanced Procurement Noitce (APN) has been issued by the Design Builder - EllisDon Corporation (EllisDon) to notify interested trade contractors, vendors and suppliers of its intention of upcoming procurement opportunities. Further project details and construction schedules may be confirmed mid-/fall 2025. *Construction cost is unreleased.

Pre-Construction/Negotiated

Transportation Terminals

$100,000,000.00

Public - Federal

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
17
Bidding Soon
111
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2026

Project location map

30 Centennaire Dr, Southport, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.