Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 6, 2026 at 8:00 PM
Updated July 12, 2026
Site work and new construction of a military facility in Southport, Manitoba. Working plans call for the construction of a 113,021-square-foot, two-story above grade military facility.
Design and construction of the Future Aircrew Training (FAcT) Program infrastructure at Southport Aerospace Centre Inc. The infrastructure will support training of personnel, as well as storage and maintenance of aircraft. Plans include construction of three buildings: 1) A hangar and maintenance facility is developed as a one-story building of non-combustible construction to house the storage and maintenance of multiple aircraft with associated program spaces to include supply storage and warehouse, workshops, vehicle storage, offices, meeting rooms, training rooms and staff support functions. 2) A two-story Training Building will be a non-combustible construction type. The facility will house the classrooms, lockers, auditorium, offices, meeting rooms and staff support functions. The provision of rooftop mechanical platforms, size, and locations will be determined in the detailed design phase. Based on the size of the mechanical platforms, the building may be classified as a three-storey building. 3) A new one-storey Simulator Building is of non-combustible construction. The facility will house the simulators and the associated small and large briefing rooms. The provision of rooftop mechanical platforms, size, and locations will be determined in the detailed design phase. TIMELINE: Project is in design. An Advance Notice has been issued by EllisDon to notify the industry of the upcoming tender opportunity for Early Works Package (A). Early works construction is currently anticipated to commence Fall 2026, with building foundation work to begin early 2028, subject to project approvals. *Construction cost is unreleased.
Pre-Construction/Negotiated
Transportation Terminals
$100,000,000.00
Public - Federal
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2026
30 Centennaire Dr, Southport, MB
Related To This Project
Southport, MB
Bid Date: Apr 03 2025
Southport, MB
Bid Date: May 14 2025
Southport, MB
Bid Date: Jun 27 2025
Southport, MB
--
Southport, MB
Bid Date: Jul 31 2025
Southport, MB
Bid Date: Aug 08 2025
Southport, MB
--
Southport, MB
Bid Date: Aug 13 2025
Southport, MB
Bid Date: Sep 16 2025
Southport, MB
Bid Date: Jan 10 2025
Southport, MB
Bid Date: Jan 21 2025
Southport, MB
Bid Date: Nov 22 2024
Southport, MB
Bid Date: Sep 05 2024
Southport, MB
Bid Date: Jun 18 2024
Southport, MB
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
