Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 5, 2025 at 8:00 PM
Updated April 17, 2025
Site work for a bridge / tunnel in Palmer, Alaska. Completed plans call for site work for a bridge / tunnel.
Chickaloon Village Traditional Council is requesting issuance of a land-use permit for the replacement of a culvert on Premier Creek from May through July 2025. Construction will require temporary stream diversion and construction of a temporary detour road and bridge. The channel inlet and outlet modification necessitate the extraction of 4 cubic yards of in-situ material, and backfill of 52 cubic yards of gravel, cobble, and boulders, along with bank construction using rock, topsoil, vegetative mats, and native plants. Approximately 1 acre of trees and brush will be cleared to allow heavy equipment to reach the site. A 225-foot long, single lane diversion road with a 30-foot temporary bridge will be utilized and removed upon project completion. Questions concerning this activity should be directed to Kathryn Ireland, Telephone: (907)269-8569; Fax: (907) 269-8913 or e-mail: kathryn.ireland@alaska.gov. After review and adjudication, we may issue an authorization with stipulations for the activity. The activity may be modified during the review and adjudication process. The DMLW reserves the right to waive technical defects in this notice.
Post-Bid
Bridges / Tunnels
$500,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 16, 2025
May 16, 2025
Buffalo Mine Rd, Palmer, AK
Related To This Project
Palmer, AK
Bid Date: Apr 17 2025
Palmer, AK
Bid Date: Apr 28 2025
Palmer, AK
Bid Date: May 08 2025
Palmer, AK
Bid Date: May 08 2025
Palmer, AK
Bid Date: May 05 2025
Palmer, AK
Bid Date: May 08 2025
Palmer, AK
Bid Date: May 07 2025
Palmer, AK
Bid Date: Apr 02 2025
Palmer, AK
Bid Date: Apr 01 2025
Palmer, AK
Bid Date: Apr 16 2025
Palmer, AK
Bid Date: Apr 11 2025
Palmer, AK
Bid Date: Apr 07 2025
Palmer, AK
Bid Date: Mar 27 2025
Palmer, AK
Bid Date: Mar 28 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
