Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 5, 2025 at 8:00 PM

Updated April 17, 2025

Site work for a bridge / tunnel in Palmer, Alaska. Completed plans call for site work for a bridge / tunnel.

Chickaloon Village Traditional Council is requesting issuance of a land-use permit for the replacement of a culvert on Premier Creek from May through July 2025. Construction will require temporary stream diversion and construction of a temporary detour road and bridge. The channel inlet and outlet modification necessitate the extraction of 4 cubic yards of in-situ material, and backfill of 52 cubic yards of gravel, cobble, and boulders, along with bank construction using rock, topsoil, vegetative mats, and native plants. Approximately 1 acre of trees and brush will be cleared to allow heavy equipment to reach the site. A 225-foot long, single lane diversion road with a 30-foot temporary bridge will be utilized and removed upon project completion. Questions concerning this activity should be directed to Kathryn Ireland, Telephone: (907)269-8569; Fax: (907) 269-8913 or e-mail: kathryn.ireland@alaska.gov. After review and adjudication, we may issue an authorization with stipulations for the activity. The activity may be modified during the review and adjudication process. The DMLW reserves the right to waive technical defects in this notice.

Post-Bid

Bridges / Tunnels

$500,000.00

Public - State/Provincial

Site Work

4

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
10
Bidding Soon
241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

May 16, 2025

Project location map

Buffalo Mine Rd, Palmer, AK

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed