Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2025 at 8:00 PM

Updated August 4, 2026

Site work and paving for a mixed-use development in Fullerton, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

No Bid will be accepted unless it is made on the Bid Schedule form furnished by the Public Works Department, Engineering Division contained within the Specifications. The Work shall consist of, but not limited to: demolition and removals for existing facilities; grading and excavation; water pollution control and reporting; construction of concrete hardscape, asphalt concrete pavement, curb ramps, curbs; drainage facilities; fencing; lighting, irrigation; landscaping; striping and signage; and all related work. The time of completion of contract shall be ninety (90) working days as defined in the Standard Specifications for Public Works, 2024 Edition. Liquidated Damages, as defined in the referenced specifications, Section 6-9, shall be $600 per calendar day. The Engineer's estimate for this project is $2,400,000. Any questions regarding this bid package may be referred to Juan Zavala, Public Works Department Engineering Division at 714.738.6322.

Bid Results

Sidewalks / Parking Lot

$1,845,776.00

Public - City

Paving, Site Work

41

19

5

5

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
664
Active Projects
294
Bidding Soon
4,492
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

June 7, 2025

Project location map

S Pacific Dr, Fullerton, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed