BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2025 at 8:00 PM

Updated July 16, 2025

Site work and paving for a mixed-use development in Fullerton, California. Completed plans call for site work for a road / highway; sidewalk / parking lot; and water / sewer project.

The Work shall consist of, but not limited to, removing and constructing concrete hardscape, removing and constructing curb ramps, repairing sewer main pipe, removing and construction of new asphalt concrete pavement, adjustment of valve boxes, water pollution control, and all related work. The Engineer's estimate for this project is $623,000. In addition, a Performance Bond in the amount of 100% of the bid, and a Labor and Materials Bond in the amount of 100% of the bid shall be required of the successful bidder prior to entering into a contract.

Award

Roads / Highways

$547,392.00

Public - City

Paving, Site Work

12

6

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
3
Bidding Soon
2,170
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

June 23, 2025

Project location map

Multiple Locations, Fullerton, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.