BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Renovation of a water / sewer project in Riverton, Utah. Completed plans call for the renovation of a water / sewer project.

Estimated project cost is $106,000,000. Jordan Valley Water Treatment Plant Filter and Chemical Feed Upgrades This project installs new media for a higher rated filter capacity. It also installs chemical upgrades as required for to expand JVWTP from 180 MGD to 255 MGD. Project includes one new gaseous chlorine building and one new caustic feed building. All questions relative to this project prior to the opening of bids shall be directed to the Engineer for the project. It shall be understood, however, that no interpretations of the specifications will be made by telephone, nor will any "or equal" products be considered for approval prior to award of contract. Engineer Carollo Engineers Project Engineer: Stetson Bassett 7090 S Union Park Ave Suite 600 Salt Lake City, UT 84047 Telephone:801-233-2500 Email: sbassett@carollo.com All RFI’s should be submitted before 2:00 pm on May 29, 2025.

Award

Water / Sewer

$100,034,100.00

Public - County

Renovation

533

35

135

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
63
Bidding Soon
997
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

September 12, 2025

Project location map

15305 S 3200 W, Riverton, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.