BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2025 at 8:00 PM

Updated May 17, 2025

Site work and paving for a bridge / tunnel in Walton, Kentucky. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Boone County NHPP 0713 (069) : Louisville-cincinnati Road (I-71) From Mp 69.8 to Mp 77.4, a Distance of 7.60 Miles. Asphalt Rehab With Bridge (S). SYP No. 06-20001.00. the Dbe Participation Goal is 4.50%. The Department Will Only Accept Bidder Registration Forms From Contractors Who Are Prequalified in the Work Categories of the Particular Project. Registration Will Be Closed at 3:00 Pm on the Day Preceding the Letting. KYDOT - 100 - Asphalt Rehab With Bridge (S) Questions about projects during the advertisement should be submitted in writing to the Division of Construction Procurement. This may be done by email to kytc.projectquestions@ky.gov. The Department will attempt to answer all submitted questions. The Department reserves the right not to answer if the question is not pertinent or does not aid in clarifying the project intent. The deadline for posting answers will be 3:00 pm Eastern Daylight Time, the day preceding the Letting. Questions may be submitted until this deadline with the understanding that the later a question is submitted, the less likely an answer will be able to be provided.

Award

Bridges / Tunnels

$12,794,227.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
184
Bidding Soon
2,411
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

June 23, 2025

Project location map

I-71, Walton, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.