Published May 29, 2025 at 8:00 PM

Updated May 30, 2025

Site work for a water / sewer project in Eastanollee, Georgia. Completed plans call for site work for a water / sewer project.

Any bid received after the bid closing time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically provided in the Instructions to Bidders and/or by State law. Base Cost of all Bids will be posted by the Owner/Engineer to the online website within approximately 30 minutes after the bid closing time. The work to be completed shall consist of furnishing all materials, labor, and equipment necessary to complete the Freeman Creek Lift Station Improvements shown on the Drawings and as specified herein, including, but not limited to, mobilization/demobilization, bonds, insurance, pumps installation, control panel installation, pipe preparation and coating, generator, gauges, grading, SCADA, crane, concrete, soil erosion and sediment control and grassing at the lift station site, construction exit, electrical, mechanical, painting and other appurtenances necessary to provide a complete and working installation. Time allotted for completion of work is 90 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. Question Deadline 04/30/2025

Award

Water / Sewer

$369,213.00

Public - County

Site Work

14

21

4

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
316
Active Projects
186
Bidding Soon
2,244
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2025

June 5, 2025

Project location map

Freeman Creek Rd, Eastanollee, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.