BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Renovation of an office development in Miami, Florida. Working plans call for the renovation of a office development.

PROJECT NAME: Rohde Building ADA Corrections LOCATION: Miami, Florida : PROJECT SCOPE The selected Construction Manager at Risk will be renovating approximately forty (40) restrooms in the North and South Towers of the Rohde Facility in Miami, Florida, and additional renovations for ADA compliance at the Facility over a multi-year phased approach with the scope dependent on annual funding. The renovations will conform to Americans with Disabilities (ADA) standards and REDM design standards. 100% signed and sealed Construction Documents (blueprints) are available for the entire scope of work and will be provided to the selected Construction Manager. The scope includes but is not limited to: interior remodeling of men's and women's restrooms; installation of new plumbing fixtures; addition of new restroom accessories; relocation of doors to provide the required clearance; and replacement of wall tiles. All work will be to ADA standards and compliance. Additional work for this project could include work detailed in the 2014 report for ADA Corrections at the Rohde Facility, including Parking Garage #62. This report will be provided to the selected Construction Manager. Current funding is approximately $970,500 for the current phase with additional funding contingent upon future appropriation by the Legislature. Deadline to submit questions to the Construction Procurement Liaison. By 5:00 PM 03/18/2025 Anticipated posting of answers to questions posted to the VIP website. By 5:00 PM 03/25/2025 Any questions from prospective firms concerning the RFQ shall be submitted in writing, identifying the firm, to the Construction Procurement Liaison by email at REDMProcurement@dms.fl.gov no later than 5:00 p.m., Tuesday, March 18, 2025. All questions and answers/changes to the RFQ will be provided in writing and posted on the VIP website. Anticipated posting of the list of vendors selected for an interview and presentation to the VIP website. 05/06/2025 Firm Interviews /Presentations 05/22/2025 Anticipated posting of Selection Committee's recommended selection to the VIP website. 05/27/2025 Anticipated pre-construction start date. 07/30/2025

Final Planning

Office

$240,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

August 11, 2025

Project location map

To Be Determined, Miami, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.