Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 14, 2025 at 8:00 PM
Updated May 15, 2025
Renovation of an office development in Miami, Florida. Working plans call for the renovation of a office development.
PROJECT NAME: Rohde Building ADA Corrections LOCATION: Miami, Florida : PROJECT SCOPE The selected Construction Manager at Risk will be renovating approximately forty (40) restrooms in the North and South Towers of the Rohde Facility in Miami, Florida, and additional renovations for ADA compliance at the Facility over a multi-year phased approach with the scope dependent on annual funding. The renovations will conform to Americans with Disabilities (ADA) standards and REDM design standards. 100% signed and sealed Construction Documents (blueprints) are available for the entire scope of work and will be provided to the selected Construction Manager. The scope includes but is not limited to: interior remodeling of men's and women's restrooms; installation of new plumbing fixtures; addition of new restroom accessories; relocation of doors to provide the required clearance; and replacement of wall tiles. All work will be to ADA standards and compliance. Additional work for this project could include work detailed in the 2014 report for ADA Corrections at the Rohde Facility, including Parking Garage #62. This report will be provided to the selected Construction Manager. Current funding is approximately $970,500 for the current phase with additional funding contingent upon future appropriation by the Legislature. Deadline to submit questions to the Construction Procurement Liaison. By 5:00 PM 03/18/2025 Anticipated posting of answers to questions posted to the VIP website. By 5:00 PM 03/25/2025 Any questions from prospective firms concerning the RFQ shall be submitted in writing, identifying the firm, to the Construction Procurement Liaison by email at REDMProcurement@dms.fl.gov no later than 5:00 p.m., Tuesday, March 18, 2025. All questions and answers/changes to the RFQ will be provided in writing and posted on the VIP website. Anticipated posting of the list of vendors selected for an interview and presentation to the VIP website. 05/06/2025 Firm Interviews /Presentations 05/22/2025 Anticipated posting of Selection Committee's recommended selection to the VIP website. 05/27/2025 Anticipated pre-construction start date. 07/30/2025
Final Planning
Office
$240,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2025
August 11, 2025
To Be Determined, Miami, FL
Related To This Project
Miami, FL
--
Miami, FL
Bid Date: May 14 2025
Miami, FL
Bid Date: May 27 2025
Miami, FL
Bid Date: May 14 2025
Miami, FL
Bid Date: May 13 2025
Miami, FL
Bid Date: May 14 2025
Miami, FL
Bid Date: Apr 24 2025
Miami, FL
Bid Date: May 13 2025
Miami, FL
Bid Date: May 08 2025
Miami, FL
Bid Date: May 14 2025
Miami, FL
Bid Date: Apr 08 2025
Miami, FL
--
Miami, FL
Bid Date: May 07 2025
Miami, FL
Bid Date: Jul 09 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
