BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 11, 2026

Renovation of a recreation facility in Fond du Lac, Wisconsin. Completed plans call for the renovation of a recreation facility.

BNOTICE IS HEREBY GIVEN that the Fond du Lac County Purchasing Manager is requesting bids for installation of metal roof overlay of the Fond du Lac County Expo Center addition located at the Fond du Lac County Fairgrounds, 520 Fond du Lac Ave, Fond du Lac, WI. Contractor shall provide all labor, materials, equipment, and supervision necessary to complete a fully functional, watertight, manufacturer-warrantable roofing system. Roofing System: Install EPS flute-fill insulation in existing metal roof panels Install recovery board Install 60 mil TPO roofing system (mechanically fastened or adhered per manufacturer requirements) Heat-weld all seams Flash all penetrations CRITICAL TRANSITION & EDGE REQUIREMENTS 1. SIDEWALL (EXISTING BUILDING - LONG RUN) Base Bid (Required): o Remove and store existing gutter for reuse o Remove or release lower metal wall panels o Install TPO vertically (minimum 8 inches, 12 inches preferred where feasible) o Terminate membrane behind wall panels o Reinstall wall panels with clearance above roof o Reinstall gutter adjusted to new roof elevation Termination under the gutter is not permitted in the Base Bid. ROOF END CONDITIONS (GUTTER TERMINATIONS) At roof section ends where the roofing system terminates into an existing gutter: o Termination into the gutter is permitted and expected o Contractor shall install appropriate edge metal, drip edge, or flashing to direct water into the gutter system o All terminations shall be installed in accordance with manufacturer requirements to ensure a watertight condition This condition applies only to roof ends and does not apply to sidewall conditions described above. 2. VESTIBULE / TOWER TRANSITIONS Base Bid: o Remove steel where feasible o Terminate membrane behind steel components Alternate #1 (Only Where Approved): o Surface termination allowed o Must include metal counterflashing or trim o Exposed termination bars are not permitted 3. EAST ELEVATION (FRONT - PARKING LOT SIDE) Aesthetic Requirement (Mandatory): o All exposed edges shall include metal fascia, drip edge, or counterflashing o Finish shall match existing building Not allowed: o Exposed termination bars o Exposed fasteners without trim o Visible raw membrane edges 4. GUTTER WORK o Remove and reinstall gutters as required o Adjust for new roof elevation o Ensure proper drainage o Replace damaged components All gutter work shall be included in the Base Bid. Work to be completed as soon as possible, with preference for July 10, 2026 completion Contractor shall include estimated start date and duration

Bid Results

Amusement and Recreation

$48,892.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
154
Bidding Soon
2,288
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

June 29, 2026

Project location map

520 Fond du Lac Ave, Fond du Lac, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.