Published May 16, 2025 at 8:00 PM

Updated May 17, 2025

Site work and paving for a sidewalk / parking lot in Daytona Beach Shores, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of May 16, 2025, project was awarded to E&H Paving but awarded amount is not available **As of May 16, 2025, project was awarded to E&H Paving but unable to locate the company on CRM. The City of Daytona Beach Shores is accepting formal quotes for the complete repaving of the Daytona Beach Shores City Hall located at 2990 S. Atlantic Avenue. The contractor will perform job pursuant to the scope of work and specifications outlined below. Except for extenuating circumstances, job must be completed by September 30, 2025. ALL PROSPECTIVE BIDDERS/RESPONDENTS ARE HEREBY CAUTIONED NOT TO CONTACT ANY MEMBER OF THE blank STAFF OR OFFICIALS OTHER THAN THE SPECIFIED CONTACT PERSON. M/WBE's are encouraged to participate in the bid process. A. Scope of Work - General Requirements 1. The contractor shall not engage or use the services of subcontractors in performing the contract unless the contractor obtains prior written approval from the City. 2. The contractor shall be responsible for supervision required to satisfactorily perform the requirements of the contract. 3. The contractor shall be responsible for keeping the areas of work as clean and confined as possible at all times. 4. The contractor must furnish all equipment necessary to satisfactorily complete the requirements of the contract. 5. Contractor shall be licensed by the State of Florida, Department of Business and Professional Regulation to perform the terms of this contract, as may be required. 6. All wastes shall be placed in a contractor provided dumpster and disposed of prior to job completion. 7. Contractor shall provide work meeting the specifications outlined in the specifications below. The City Hall parking lot contains approximately 22,200 square feet or approximately 2,500 square yards of asphalt. The contractor will perform job pursuant to the scope of work and specifications in this section below: 1. Mill 1.25" old/existing asphalt along concrete curbing to ensure a flush edge after paving. 2. Parking lot swept clean. 3. Prime tack coat. 4. Supply and install 1.25" of hot mix asphalt 9.5MM. 5. Restripe all parking areas. 6. Remove existing wheel stops and replace as needed. 7. T he wor k shall include all labor, materials, equipment, tools, transportation services, clean up and incidentals necessary to complete all work required per the specifications. 8. Work shall be on weekend and/or outside of normal business hours. All Questions must be submitted no later than 2:00pm on April 15, 2025. Questions received and answers given will be posted on the city website

Award

Sidewalks / Parking Lot

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2025

May 19, 2025

Project location map

2990 S Atlantic Ave, Daytona Beach Shores, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.