BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2025 at 7:00 PM

Updated November 20, 2025

Renovation of an educational facility in Muskogee, Oklahoma. Completed plans call for the renovation of a educational facility.

**As of June 23, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Site Directions: Muskogee Campus across various locations, beginning at the Administration Building at 2400 West Shawnee Street 74403, Muskogee, OK. Bid submiision info : The lower left-hand corner of the envelope shall be marked: BID PACKAGE: #B25-14- NSU Muskogee Exterior Doors The envelope shall be addressed to: Northeastern State University Attention: Christopher Gay Purchasing Department 600 North Grand Avenue Tahlequah, OK 74464 Work Summaries The following Contract (Bid Group) Work Summaries describe the intended scope of work to be included in the Bid Package. The bid shall include all the requirements of the plans with specifications unless specifically indicated otherwise in this summary. This includes all layout and daily clean up involved with the work. It is the bidder's responsibility to review bidding requirements and forms to insure a complete, safe, and coordinated execution of the Work Package being quoted. Additionally, bidders shall include in their pricing applicable portions of related specification sections normally associated with the work to be done whether specifically indicated by this Contract Work Summary or not. Should any bidder be unclear as to the scope of work required, he is instructed to contact the Owner for resolution prior to bidding. In the absence of written instruction to the contrary, in matters of specification and/or scope of interpretation, bidders shall include the more costly and complete of the possible interpretations. Awarding of Contracts will be based on the best qualified bid. CONTRACT: General Construction Work including but not limited to the following: 1) Drawings and Specifications as identified in Contract Attachment "B." Including But Not Limited To: 1) Contractor shall provide all labor, material, and equipment for the installation of a complete, operational, and properly functioning of all doors called out in the provided Construction Documents. 2) Every door has been designed to meet all requirements outlined in the contract documents. 3) Contractor shall maintain all active building egress. Only one set of doors can be inoperable at a time. 4) Contractor staging area has been called out on Construction Documents. 5) NSU is a "Tobacco Free" campus; Contractor will be expected to abide by NSU policy and will be held accountable for all Subcontractors on site. 6) Contractor shall be responsible for coordination of all necessary local, state and federal, pre, during and post compliance inspections. 7) Contractor shall provide NSU with documentation of compliance at completion of work. 8) Contractor to be responsible for all permits and fees associated with this scope of work. 9) Work may be halted and resumed at any given time according to NSU's needs. 10) Contractor shall be responsible for mobilization and staging locations to minimize daily operations of the university. 11) Utility terminations shall be in accordance with the governing utility procedures and regulations. NSU will be given a minimum of 24 hours' notice prior to any utility outages/shut-offs. 12) Contractor shall be responsible for coordinating any and all utility locations for the project. 13) Contractor is responsible for furnishing, receiving, protecting and installing specified materials per the construction documents. 14) Contractor is responsible for all field verifications of dimensions and conditions. 15) Contractor is to ensure that construction trash and demolished debris is gathered and disposed of daily in contractor provided trash receptacle. 16) Contractor is responsible for daily clean-up and equipment storage. NSU is not responsible for damaged or stolen property and/or equipment. 17) Contractor shall be responsible for abiding OSHA and NSU safety regulations. 18) Contractor shall be responsible for protection of existing equipment and materials that are not called out to be demolished or repaired. 19) Any discrepancy between the plans/specifications and actual field conditions must be submitted in writing to the owner a minimum of 48 hours prior to the bid closing date. 20) Contractor shall be responsible for demolition, removal, loading and haul off of all materials, scraps and debris. 21) Contractor shall be responsible for any broken or crushed concrete sidewalks, curbs, decks, walls or other cementitious materials. 22) Contractor shall not interfere with building exits or egress paths of any occupied buildings. 23) Contractor shall maintain a site supervisor at all times when the contractor has a presence on campus. 24) Contractor shall be responsible for Final Cleaning. This will be to the Owner's discretion. 25) Contractor shall supply accurate "red-line" drawing to Owner prior to final payment. 26) Contractor shall be responsible for and acknowledge all plans, specifications, and details as shown in all bidding documents. 27) Contractor shall provide Owner training for operations and maintenance of new equipment and systems. 28) Contractor shall provide restroom facilities for for employees to include sub contractors.

Award

Educational

$315,000.00

Public - State/Provincial

Renovation

14

3

9

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
112
Bidding Soon
1,269
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

June 9, 2025

Project location map

2400 Old Shawnee Rd, Muskogee, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.