Published October 30, 2025 at 8:00 PM
Updated October 31, 2025
Site work and paving for a road / highway in Glen Carbon, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of October 30, 2025, per owner, this project was bid through IDOT in early 2025 and has been under construction since summer 2025. The Village of Glen Carbon, Illinois is issuing a Request for Qualifications ("RFQ") to IDOT Prequalified Engineering firms for professional engineering services for the Cottonwood Right Turn Lane Project. Proposals received after the closing time and date will be returned unopened. All questions should be addressed to Scott Slemer, P.E., Director of Public Works at saslemer@glencarbonil.gov. A. SELECTION PROCESS A.01 General Purpose: Procurement of professional services to provide construction engineering in accordance with IDOT standards. A.02 Responses to the Request: The firm shall submit a response to the RFQ which will be evaluated and ranked by the Village Engineer and Village Administrative Staff for the Village of Glen Carbon. A.03 Submission Requirements: Four (4) copies of the RFQ submittal are requested. Lengthy submittals are discouraged; please keep them short and readable. B. TERMS AND CONDITIONS B.01 Reserved Rights: The Village of Glen Carbon reserves the right at any time and for any reason to cancel this consultant procurement process, to reject any or all proposals, or to accept an alternative proposal. The Village and/or staff may seek clarification from an offer atany time and respond promptly if there is cause for rejection. B.02 Criteria for Selection: The consultant selection shall be based on the evaluation of the firm's proposal by aselection committee. The selection committee shall consist of a panel of engineering and administrative staff employed by the Village. The Group follows qualifications-based consultant selection procedures. Interviews MAY be required for the top two (2) firms. The Village of Glen Carbon reserves the right to consider any proposal and to reject any and all proposals ifdoing so best serves the public interest. The following criteria will be used to evaluate and rank the Project Proposals: B.03.1 Firm Experience: This refers to the background, history and structure of the firm. B.03.2 Specialized Experience: This refers to the exact type and nature of the service to be provided. Modification or expansion of the scope of services is encouraged where the consultant feels essential elements have been overlooked by the Group. However, each ofthe listed work elements must beaddressed in some manner to qualify for consideration. Explain and support how your firm is uniquely qualified toprovide this service tothe Village of Glen Carbon. Give details of your experience incompleting similar public works projects, firm experience and past performance. B.03.3 Staff Capabilities (Prime/Sub): Whether the personnel assigned to the project have the knowledge, experience, education and qualifications necessary to successfully perform this task. B.03.4 Scheduling/Work Load Capacity: This refers to the firm's proposed workload and the capability toprovide adequate personnel. B.03.5 In-State orLocal Presence: Proximity ofthe firm and assigned personnel to the Village of Glen Carbon. B.03.6 The above categories will be used to evaluate the firm based on the following weight ranking work sheet: Criteria Max Points Points Confidentiality: All submissions submitted by the firm shall be confidential and may not be discussed or shared. C.01.1 The Firm: Include Main Contact Information, Background, History and Structure. C.01.2 Terms and Conditions: List any terms and conditions, which may apply to acontract and are not included in this Scope of Services. C.01.3 References: List atleast three references, which you believe support your firm and the RE's qualifications to complete a project. C.01.4 Personnel: Provide Resume(s) and details of the Resident Engineer(s) you are proposing. Details shall include similar size and type of project experience, how they manage their staff and sub-consultants, knowledge they have used to insure the successful completion of a complicated project including organizational skills, public notification, management style, budgeting time, contractor communication, conflict resolution and project close out including punch list. List any other office personnel who will be directly involved as well as any additional projects the on-site staff will be managing simultaneously to the proposed project. Focus shall be the on-site engineers that you plan to assign to the project. C.01.5 Conflict of Interest: Complete and submit the IDOT BDE DISC 2Template. The project consists of the construction of right turn lanes on Glen Carbon Road southward and Route 159 eastward and will require nighttime work due to the lane closures. Work is anticipated to begin inSummer 2025 with work progressing through the rest ofthe year. This project islargely funded byafederal grant from the Congestion Mitigation and Air Quality Improvement Program. Construction -$1,499,929.00 Construction Engineering -$225,000.00 Total Project Cost -$1,724,929.00 The scope of services shall meet IDOT standard construction engineering services for local agency agreement. Services shall consist of construction observation and related services to construct the right turn lanes. The method of Contractor Selection has not been Determined at this time.
Under Construction
Roads / Highways
$1,724,929.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2025
Multiple Locations, Glen Carbon, IL
Related To This Project
Glen Carbon, IL
Bid Date: May 29 2025
Glen Carbon, IL
Bid Date: Jun 03 2025
Glen Carbon, IL
Bid Date: Nov 07 2025
Glen Carbon, IL
--
Glen Carbon, IL
Bid Date: Sep 19 2025
Glen Carbon, IL
Bid Date: Sep 17 2025
Glen Carbon, IL
--
Glen Carbon, IL
--
Glen Carbon, IL
Bid Date: Mar 18 2025
Glen Carbon, IL
Bid Date: Mar 07 2025
Glen Carbon, IL
--
Glen Carbon, IL
Bid Date: Mar 07 2025
Glen Carbon, IL
Bid Date: Mar 07 2025
Glen Carbon, IL
--
Glen Carbon, IL
Bid Date: Jan 13 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.