BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2026 at 7:00 PM

Updated March 5, 2026

Demolition, site work, paving and new construction of a civil project in Glen Carbon, Illinois. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for the construction of a bridge / tunnel; and for the demolition of a bridge / tunnel.

https://www.mrt.com/news/article/illinois-157-162-closure-glen-carbon-21345391.php IDOT to close Illinois 157, 162 intersection in Glen Carbon starting Feb. 26 IDOT is preparing to close the intersection of Illinois 157 and 162 on Feb. 26. Penny Weaver/The Intelligencer The Illinois Department of Transportation will close the intersection of Illinois 157 and Illinois 162 in Glen Carbon beginning at 7 a.m. Thursday, Feb. 26, weather permitting. According to an IDOT news release, “during the closure, traffic will not be permitted on Illinois 157 and Illinois 162 at the intersection. Both eastbound and westbound Illinois 162 will be closed, and neither will have access to Illinois 157.” Drivers heading northbound on Illinois 157 should take Interstate 55/70 westbound to Interstate 255 northbound to Interstate 270 eastbound to reconnect with Illinois 157. Drivers heading southbound on Illinois 157 should take Interstate 270 westbound to Interstate 255 southbound to Interstate 55/70 eastbound to reconnect with Illinois 157. Drivers heading westbound on Illinois 162 should take Illinois 159 northbound to Interstate 270 westbound to Interstate 255 southbound to reconnect with Illinois 162. Drivers heading eastbound on Illinois 162 should take Interstate 255 northbound to Interstate 270 eastbound to Illinois 159 southbound to reconnect with Illinois 162. The closure is necessary as a major reconstruction project begins that includes the construction of two new bridges, a new signalized four-way intersection, and new bike and pedestrian accommodations. Illinois 157 and the eastern leg of Illinois 162 are expected to be completed by Oct. 31, with the overall project, including the western leg of Illinois 162, expected to be completed by July 31, 2027. ------------------------------ This work shall consist of the removal and disposal of regulated substances according to Section 669 of the Standard Specifications as revised below. Project No. R-98-003-10 Intersection improvements with signals and bridge replacement on IL 162/IL 157 in Glen Carbon. Region 5 District 8 Federal Project # NHPP-STP-HSIP6ATA(489) County(s) Madison Key Route(s) FAP 586 FAP 586A FAP 592 Marked Route(s) IL 162/IL 157 Section(s) 51-1R State Job #(s) C-98-283-18 Questions not accepted as of January 06, 2026 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, December 26, 2025. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. IL DOT - 125 - Intersection Improvements With Signals and Bridge Replacement on IL 162/IL 157

Award

Bridges / Tunnels

$17,570,642.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

310

9

7

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
10
Bidding Soon
1,176
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2026

March 17, 2026

Project location map

IL-162 & IL-157, Glen Carbon, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.