BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 4, 2025 at 8:00 PM

Updated August 20, 2025

Renovation of an educational facility in Santa Maria, California. Working plans call for the renovation of a educational facility.

** As of 06/04/2025 bids were rejected. As of this time it is unknown if and when project will rebid.** Scope of Services GYM MECHANICAL IMPROVEMENTS AT EL CAMINO JUNIOR HIGH SCHOOL Local Programs & Policies Disabled Veteran Business Enterprises (DVBE) Participation Requirement State law and regulations adopted by the State Allocation Board (SAB) require that State-funded contracts have participation goals of 3% for Disabled Veteran Business Enterprises as defined in Public Contract Code Section 10115.1. To be considered, a FIRM is required to meet the participation goals or make a good-faith effort to meet the DVBE participation goals as outlined in the regulations. In awarding the contract, the District shall consider the firm's compliance with SAB statutes and regulations related to DVBE participation. Contact Info Patricia McKnight and Anel DIaz Purchasing@smbsd.net, adiaz@smbsd.net Online Q&A Yes Q&A Deadline 05/01/2025 5:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $500.00 Per Calendar Day Estimated Bid Value Not Available Start/Delivery Date June 12, 2025 Project Duration 50 Calendar Days Replacement of existing mechanical systems at Buildings 010, 020, 030, 50, 60, 80, 100, 140, 900, and 1000. Fan coil units, heat pump condensing units and package heat pump units are all to be provided by the owner. Contractor to provide installation of said equipment only along with all other associated work required as part of these drawings. Contractor to conduct cleaning of existing ductwork system in the buildings mentioned above. 2. The intent of these drawings and specifications is that the alteration, rehabilitation or reconstruction is to be in accordance with Title 24, California Code of Regulations. Should any existing conditions such as deterioration or non-complying construction be discovered which is not covered by the contract documents wherein the finished work will not comply with Title 24, California Code of Regulations, a Construction Change Document, or a separate set of plans and specifications, detailing and specifying the required repair work shall be submitted to and approved by Division of the State Architect before proceeding with the repair work.

Final Planning

Educational

$2,398,656.00

Public - City

Renovation

25

24

4

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
2
Bidding Soon
263
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

December 4, 2025

Project location map

219 W El Camino St, Santa Maria, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.