BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 11, 2026 at 8:00 PM

Updated September 17, 2026

Site work and new construction of a detention facility in Little Rock, Arkansas. Working plans call for the construction of a 80,000-square-foot detention facility; and for site work for a detention facility.

TIMELINE: As of September 11, 2026, this project is currently on hold due to lacking funding approval by the State legislators. A timeframe for forward movement has not been disclosed. Original RFP below for reference: Written responses will be considered if received by 4:00 PM on 04/22/2025. The Agency encourages all small, minority, and women business enterprises to submit proposals for capital improvements. Encouragement is also made to all general contractors that, in the event they subcontract portions of their work, consideration is given to the identified groups. The Agency reserves the right to reject any or all proposals and to waive any formalities. General description based upon assumptions prior to design professional under contract. The final design may not reflect these assumptions, and the final design will prevail over any perceived conflicts with this general description: Project goal of 3,000 bed facility, a combination of dorms and cells with approximately 900 staff. Site work will include staff and visitor parking lots, storm water management, wastewater treatment and may include plans for an onsite water treatment plant. A Central Utility Plant (assuming implementation of a loop system for all utilities with direct branches for each separate building) and an outside-of security-perimeter (outside)warehouse (approx. 80,000 Square feet); Central Maintenance (Pre-Engineered Metal Building); outside administration; inmate records management and business services area; outside visitor and staff processing/entry area; outside security armory; a double 12 foot high perimeter fence (approximately 10,000 linear ft) and two(Pre-Engineered Metal Deck) design perimeter security towers to manage one vehicle entrance sally port and one pedestrian sallyport. The interior will include one main kitchen to prepare9,500 meals each day, one centralized health care facility, one centralized laundry, one centralized inmate receiving and discharge (release), a central control. Each facility within the perimeter will be semi-autonomous providing dining, gymnasium, health services (clinic level) educational, inmate clothing exchange, inmate commissary, counseling services and administrative offices. Project will include dedicated programming areas for cognitive behavioral therapy, mental health services as well as an infirmary with pharmacy and nurses' station. Aiming to prepare inmates for successful reintegration into society, the project will incorporate various rehabilitation and reentry programs, including vocational trades training and maintenance building initiatives. The new prison design will integrate safe and efficient features including clear sight lines, advanced perimeter security technologies and smaller, more controlled housing units. These modern elements not only aim to improve the safety and operational efficiency of the prison but also enhance the environment for the staff and inmates.

Final Planning

Jails / Prisons

$750,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
39
Bidding Soon
456
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

March 1, 2027

Project location map

To Be Determined, Little Rock, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.