Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 18, 2025 at 8:00 PM
Updated August 6, 2025
Renovation of a mixed-use development in Little Rock, Arkansas. Completed plans call for the renovation of a medical facility.
Questions and Answers are hereby posted in the Attachments (17 Questions and Answers) BRAND NAME: Schneider Electric Ecostruxure System ******This requirement will be a Competed Small Business Setaside.***** The Federal Aviation Administrations, Bill and Hillary Clinton National Airport, Little Rock Air Traffic Control Tower (LIT ATCT) has three (3), 15-ton split computer room system HVACs that shall be replaced. The two 5 ton split computer room HVACs for the Power Conditioning System (PCS) in the Environmental Support Unit Building (ESU) shall also be replaced. The boiler for the facility shall be removed and replaced. Additionally, all controls shall be replaced. The system, controls, and computer shall replace all existing controls on the current HVAC equipment, and have the capacity to manage and expand to control all HVAC systems throughout the facility. The initial installation shall replace all field components and sensors associated with the Liebert Units that provide the equipment room cooling in the main building and the two Liebert units in the detached Environmental Support Building. The new system shall include all components and field wiring to make the new system fully operational when complete, including a new computer interface/control work station, with Enterprise Server software installed. Contractor shall create new EBO graphic page, and create new control schematic layout. Contractor shall provide and install all new CAT6 cable and ring topology network as required for a fully operational system. Contractor shall remove and replace the under floor leak detection system. The contractor shall furnish necessary equipment, materials, labor and supervision to perform the following work at the LIT ATCT located at 2601 David Grundfest Jr. Dr, Little Rock, AR 72202. Work within this area requires escort, and might include background checks for all onsite personnel, and must be coordinated with the FAA Contracting Officers Representative (COR) in advance. Adequate cooling must be maintained within the facility during the construction. Only one unit may be worked on at a time. The Contractor must submit a written plan/sequence of construction detailing the methods, equipment, points of connection, etc. that will be utilized to provide an operational air conditioning system at all times and adhere to the sequence of work proposed for removal and replacement of the HVAC units and controls. This requirement is estimated to be between $850,000.00 to $1,500,000.00. * All questions are due 14 May 2025 at 1600 CST time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Medical
$1,500,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2025
August 8, 2025
2601 David Grundfest Jr. Dr, Little Rock, AR
Related To This Project
Little Rock, AR
Bid Date: Apr 30 2025
Little Rock, AR
Bid Date: May 15 2025
Little Rock, AR
Bid Date: Apr 24 2025
Little Rock, AR
Bid Date: May 09 2025
Little Rock, AR
--
Little Rock, AR
--
Little Rock, AR
Bid Date: Jul 09 2021
Little Rock, AR
Bid Date: Jun 04 2025
Little Rock, AR
Bid Date: Apr 24 2025
Little Rock, AR
Bid Date: Apr 14 2025
Little Rock, AR
Bid Date: May 08 2025
Little Rock, AR
Bid Date: Apr 22 2025
Little Rock, AR
--
Little Rock, AR
Bid Date: Apr 29 2025
Little Rock, AR
Bid Date: Apr 17 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.