BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Demolition, site work, renovation and addition to a clubhouse / community center in Erie, Colorado. Completed plans call for the addition of a clubhouse / community center; for the demolition of a clubhouse / community center; for the renovation of a clubhouse / community center; and for site work for a clubhouse / community center.

**As of January 13, 2025, the project was awarded to collab architecture but the awarded amount is not available.** Reference Number 0000382766 Bid Intent Not Available The Town of Erie is seeking proposals from qualified design firms for pre-design services for the Erie Community Center (ECC) Facility. The pre-design phase of the project includes but is not limited to the following scope: facilitate and lead Design Advisory Group (DAG) meetings and workshops, conduct a comprehensive needs assessment, provide space programming and conceptual design services, and develop conceptual budgets for the remodel of existing ECC space to better accommodate staff, optimize current space, and improve facilities for patrons. An addition to the existing building is also anticipated to address current space constraints and accommodate growth. A Town owned facilities strategic plan was completed in 2021 which included needs assessment and space programming data. This data will be updated as part of this pre-design phase and will serve as the basis for conceptual design and budget. a The pre-design phase will be completed under a not-to-exceed agreement. The Pre-design proposal must demonstrate the Proposer's qualifications and ability to provide design services from conceptual design through construction administration and warranty period. The agreement may be amended following completion of the pre-design phase to include schematic design (SD) through construction administration (CA). The Town may elect to use conceptual phase deliverables to solicit an RFP for the SD through CA if the Town and the selected pre-design firm are unable to reach accord on scope and fees for the full design. Question Deadline 04/24/2025 at 12:00 PM MT Questions are submitted online Yes, All questions related to this bid should be submitted through the online. All answers to questions received will be sent in a formal addendum (if needed), by April 28, 2025. Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required

Award

Clubhouse / Community Centers

$2,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

6

7

18

8

Subscribe For Documents

116 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
86
Bidding Soon
1,276
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2025

July 3, 2025

Project location map

450 Powers St, Erie, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.