BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Renovation of a municipal facility in Sumter, South Carolina. Completed plans call for the renovation of a municipal facility.

Remove existing gravel surface, old JD scupper drains and cut Stucco LAST DAY FOR QUESTIONS Tuesday, April 29, 2025 at 4:00 pm ET All questions concerning this project must be submitted via email to Eric Burnette at eburnette@sumtersc.gov. If you have questions concerning the bid process, email Tony Butts at tbutts@sumtersc.gov Scope of Work: - Removal of existing gravel surface built-up roof to gypsum deck including insulation, removal of existing gravel stop FACIA and counter flashing. - Remove old JD scupper drains and down spouts along with old steel supports under AC condensers. - Cut Stucco and remove split face block as needed where it is low on the roof to accommodate new insulation height. - Clean up and dispose of all trash and debris. - Install a new base sheet to gypsum deck with bas ply fasteners. - Install new ISO insulation in two layers to achieve AVR-R=20 in low rise foam adhesive, 1 st layer 1.5" ISO and second layer 1/8" tapered ISO. - Install 1/4 " cover board in low rise foam adhesive. - Install 60 mil TPO fully adhered. - Flash walls per manufactures recommendation and fasten top with 1/8" aluminum termination bar. - Install new gravel stop FACIA 24 gage galvalume Kynar 500 finish along with counter flashing at brick wall in 24 gage galvalume Kynar 500 finish. - Install new equipment curbs at condensation units and a new 6" gutter at perimeter, gutter to be installed 1/8"x1" stainless steel layers wrapped with metal to match FACIA. - Install new 4"x 5" down spouts and metal covers where drains are removed. - Furnish 5-year workmanship warranty and 20-year manufacturers warranty Scope of Work: - Removal of existing gravel surface built-up roof to gypsum deck including insulation, removal of existing gravel stop FACIA and counter flashing. - Remove old JD scupper drains and down spouts along with old steel supports under AC condensers. - Cut Stucco and remove split face block as needed where it is low on the roof to accommodate new insulation height. - Clean up and dispose of all trash and debris. - Install a new base sheet to gypsum deck with bas ply fasteners. - Install new ISO insulation in two layers to achieve AVR-R=20 in low rise foam adhesive, 1 st layer 1.5” ISO and second layer 1/8” tapered ISO. - Install ¼” cover board in low rise foam adhesive. - Install 60 mil TPO fully adhered. - Flash walls per manufactures recommendation and fasten top with 1/8” aluminum termination bar. - Install new gravel stop FACIA 24 gage galvalume Kynar 500 finish along with counter flashing at brick wall in 24 gage galvalume Kynar 500 finish. - Install new equipment curbs at condensation units and a new 6” gutter at perimeter, gutter to be installed 1/8”x1” stainless steel layers wrapped with metal to match FACIA. - Install new 4”x 5” down spouts and metal covers where drains are removed. - Furnish 5-year workmanship warranty and 20-year manufacturers warranty.

Post-Bid

Municipal

$300,000.00

Public - City

Renovation

4

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
90
Bidding Soon
964
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

June 30, 2025

Project location map

210 S Purdy St, Sumter, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.