Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 9, 2025 at 8:00 PM
Updated April 10, 2025
This is a service / maintenance or supply contract in Prince Edward, Ontario. Contact the soliciting agency for additional information.
Reference Number 0000290990 Question Acceptance Deadline 2025/04/24 10:00:00 AM EDT The main purpose of the project is to update the 1981 regulatory floodplain mapping for the Marsh and Macaulay Creek Watershed. The approximate study area for this project is illustrated in Figure 1.0. The requirements for the Floodplain Mapping Project are outlined in the province's Flood Hazard Identification and Mapping Program-Program Guide. It is noted that Quinte Conservation has applied for Flood Hazard Identification and Mapping Program funding for this project, as a result, the Federal Flood Mapping Guideline Series guidance will be followed. The provincial "Technical Guide - River and Stream Systems: Flood Hazard Limits" will be followed. If there is a discrepancy between the guidelines. the most conservative method will be followed, or the most suitable method must be justified and approved by review agencies. Climate change shall also be considered in this project, as outlined in the provincial FHIMP Program Guide Document. To better inform flood risk assessment and management at a local level, in addition to the regulatory 100-year and Timmins storm event, the 2-year, 5-year, 10-year, 25-year, 50-year, 200-year, 350-year, shall be analyzed and mapped to determine the magnitude of their impact compared to the regulatory 100-year event. This study will undertake the necessary fieldwork, hydrologic analysis, and hydraulic analysis to generate and map the regulatory flood lines for the Marsh and Macaulay Creek watershed as outlined in the background section. All components of this analysis shall be consistent with the Ministry of Natural Resources procedures and technical standards and the mapping shall meet or exceed relevant Federal Flood Mapping guidelines. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Conceptual
Water / Sewer
Public - State/Provincial
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 10, 2025
Multiple Locations, Prince Edward, ON
Related To This Project
Prince Edward, ON
Bid Date: May 28 2025
Prince Edward, ON
--
Prince Edward, ON
Bid Date: May 29 2025
Prince Edward, ON
Bid Date: Jun 12 2025
Prince Edward, ON
Bid Date: Jul 04 2025
Prince Edward, ON
Bid Date: Jun 26 2025
Prince Edward, ON
Bid Date: Jul 15 2025
Prince Edward, ON
Bid Date: Jul 22 2025
Prince Edward, ON
--
Prince Edward, ON
--
Prince Edward, ON
Bid Date: Apr 17 2025
Prince Edward, ON
Bid Date: Dec 18 2025
Prince Edward, ON
Bid Date: Mar 25 2025
Prince Edward, ON
Bid Date: Mar 13 2025
Prince Edward, ON
Bid Date: Mar 04 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
