BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated May 29, 2025

Site work for a power facility in Dalton, Georgia. Completed plans call for site work for a power facility.

The work consists of, but is not limited to, a contract that will be signed on or about Monday, May 26, 2025, after the bids have been reviewed and evaluated. The official contract start date will be Monday, June 2, 2025, with a completion date of Friday, May 1, 2026. Work will include engineering, procurement of materials, and construction of a five-element 230kV ring bus and associated transmission lines and the replacement of 3 high-side bank protection switches at the existing Dalton City #6 substation. Breakers must be American Made Mitsubishi, Siemens, Hitachi Energy, or GE (Designed, Assembled, and tested in Pennsylvania).

Post-Bid

Power Plant

$12,000,000.00

Public - City

Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
9
Bidding Soon
1,176
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 2, 2025

Project location map

To Be Determined, Dalton, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.