Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 16, 2025 at 8:00 PM
Updated June 26, 2025
Renovation of a mixed-use development in Dalton, Georgia. Completed plans call for the renovation of a educational facility.
https://digital.dailycitizen.news/Dalton-Daily-Citizen-06142025-e-Edition/1/ Construction underway for Dalton Public Schools' Fort Hill project Historic building to be transitioned into new central office Dalton Public Schools' Director of Operations Rusty Lount says construction is underway that will convert the old Fort Hill School building at 104 Fort Hill Terrace into the school system's new cen-tral office. At the Dalton Board of Education's monthly public meet-ing on Monday, Lount said the transition of the historic building into the new central office will take close to a year. ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Scope of Work: The scope of the proposed work shall include: FT Hill - North Building and 500 Section I. Interior A. Demolition 1. Remove walls between offices 2. Remove half of the wall between classrooms 3. Remove half wall in kitchen/health room 4. Cut three doors in the hallway B. Abatement 1. Place plastic under restroom C. Framing & Walls 1. Frame up office walls - check egress with door swing (add for sheetrock) 2. Frame up restroom walls - check egress with door swing (add for sheetrock) D. Electrical 1. Add electrical drops for all offices 2. Add TECHNOLOGY data drops 3. Add data and power drops for copy machines in hallway or offices E. Plumbing 1. Replumb bathrooms and add one additional bathroom 2. Rough-in plumbing for kitchen breakroom (2nd floor) (dishwasher/sink/fridge) 3. Rearrange kitchen in health room add island, move stove to back outside wall. a) Total Building Size: +/-63,341 SF b) North Building; Office, restrooms and break areas +/-18,820 SF c) 500 Section: Offices, restrooms, meeting space, reception area: +/-5,928 SF Award CM contract: May 12, 2025 (Pending Board Meeting Approval)
Post-Bid
Educational
$725,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2025
January 8, 2026
Fort Hill Dr, Dalton, GA
Related To This Project
Dalton, GA
Bid Date: May 12 2025
Dalton, GA
Bid Date: Apr 23 2025
Dalton, GA
--
Dalton, GA
Bid Date: Jun 13 2025
Dalton, GA
Bid Date: Jun 09 2025
Dalton, GA
Bid Date: Jul 09 2025
Dalton, GA
Bid Date: Jul 16 2025
Dalton, GA
Bid Date: Aug 07 2025
Dalton, GA
Bid Date: May 13 2025
Dalton, GA
Bid Date: Apr 09 2025
Dalton, GA
--
Dalton, GA
Bid Date: Apr 09 2025
Dalton, GA
Bid Date: Apr 29 2025
Dalton, GA
Bid Date: Apr 14 2025
Dalton, GA
Bid Date: Apr 23 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
