Site work for a water / sewer project in Gary, Indiana. Completed plans call for site work for a water / sewer project.
** As of May 09, Project is awarded to Metz Sewer and Pumping with no awarded amount ** PROJECT DESCRIPTION: Sanitary Sewer Repair at 433 Arthur Street in the City of Gary, IN. Repair of sanitary sewer pipe. Manhole No. 2340 Sewer Invert Depth is +- 10.2 Manhole No. 2341 Sewer Invert Depth is +- 10.1 Perform work in strict conformance with Specification Sections 02251-Shoring, Sheeting, and Bracing; 02316- Excavation; 02317-Backfilling; 02370-Slope Protection and Erosion Control; 02500-Laying and Jointing Buried Pipelines; 02507-Buried Polyvinyl Chloride (PVC) Pipe and Fittings; 02632-Point Repair. All technical/specification questions are to be directed to Jabez Anderson (Engineering Dept) at 219-944-1211, Ext. 1235 or email: janderson@garysan.gov. Remove and replace existing 15-inch diameter pipe with 15-inch diameter PVC SDR 35 +-63-linear feet from Manhole No. 2340 to Manhole No. 2341. o Contractor shall ensure pipe penetrations are sealed and watertight. Mandrel test required upon completion ofwork with GSD staff present. o Minimum pipe slope 0.15% and shall be uniform from manhole to manhole. o Reconnect/repair active encountered "Wye" connection for existing service lines/laterals including drainage pipes that are affected. Limit ofservice lateral repairs is the easement or right-of-way. The cost to be included in the price ofthe lump sum work. o "Wye" connection for new pipe must be a molded integral part ofthe pipe section. o Use ofSaddles are not permissible. o Use of granular bedding (6-inch minimum) for new sewer pipe installation. o Backfill and compact excavated area in accordance with ASTM-D-698 and as specified in the relevant specification sections. Compaction shall be 95 percentage of maximum dry density as determined by the Standard Proctor Test (ASTM-698). o Excavate, remove, and dispose offsite damage sewer and appurtenances. o Contractors shall field verify size, depth and location ofsewer, manholes, and appurtenances. o Contractor shall be responsible for locating all utilities in the project area. o Clean the sewer from Manhole No. 2341 to Manhole No. 2340 and remove all deposits upon completion ofwork. o Televise (CCTV) and video the sewer from Manhole No. 2341 to Manhole No. 2340 upon completion ofwork. o All CCTV videos shall have audio and be done to NASCCO standards. o Submit a copy ofthe CCTV video(s) and inspection log on a flash drive or other forms of digital format, and inspection log to the Engineering Department. Ifthe digital video format quality is deemed substandard, the video will be rejected by the Engineering staff. If video shows leaks or poor workmanship, work shall be remedied and re-CCTV to show the final condition ofthe sewer upon completion and acceptance. o Support/protect utility poles, building structures, driveways, and underground utilities as necessary. o Contractor shall ensure proper flow ofsewage at all times during construction. Provide bypass pumping ofsewage as required. o Contractor shall perform dewatering activities as required. o All work must be done by experienced, trained, and properly certified technicians that are knowledgeable ofthe methods ofinstallation and repair ofsewer pipe and appurtenances. o Secure necessary permits, licenses, and notifications for construction, including but not limited to the Gary Sanitary District Stormwater Permit, Gary Board ofPublic Works and Safety Street Closing Permit and the Gary Board of Public Works and Safety Road Cut Permit. o Perform video ofthe work area to show the condition of all existing surface structures and landscape prior to site mobilizat
Award
Water / Sewer
$300,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 21, 2025
May 7, 2025
433 Arthur St, Gary, IN
Related To This Project
Gary, IN
Bid Date: Apr 25 2025
Gary, IN
Bid Date: May 15 2025
Gary, IN
Bid Date: May 16 2025
Gary, IN
Bid Date: May 15 2025
Gary, IN
Bid Date: May 28 2025
Gary, IN
--
Gary, IN
--
Gary, IN
Bid Date: Jun 27 2025
Gary, IN
Bid Date: Apr 30 2025
Gary, IN
Bid Date: Apr 09 2025
Gary, IN
Bid Date: Apr 21 2025
Gary, IN
Bid Date: Mar 18 2025
Gary, IN
Bid Date: Apr 03 2025
Gary, IN
Bid Date: Feb 21 2025
Gary, IN
Bid Date: Mar 12 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.