Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 18, 2025 at 8:00 PM
Updated June 19, 2025
Site work for a water / sewer project in Parkersburg, Iowa. Completed plans call for site work for a water / sewer project.
Work under this project consists of approximately 2206 feet of 8-inch and 6-inch watermain with fittings; approximately 3,935 feet of 4-inch subdrain; approximately 7,016 square yards of PCC or ACC street pavement; approximately 4,302 feet of PCC curb and gutter; approximately 431 feet of storm sewer; approximately 6 storm intakes; approximately; phased work; removals; seeding; along with appurtenant work. This work is shown in detail on the construction plans on file with the City Clerk. All bids must be filed on or before the Noon deadline previously stated. All bids shall be made on forms furnished by the City and must be enclosed in a separate sealed envelope and plainly identified. Each proposal shall be accompanied by Section 3 Intent to Comply Form and a bid bond, cashier's or certified check, or a credit union certified share draft, in a separate sealed envelope in an amount equal to ten percent (10%) of the total amount of the proposal. The certified or cashier's check shall be drawn on a bank in Iowa or a bank chartered under the laws of the United States or said certified share draft should be drawn on a credit union in Iowa or chartered under the laws of the United States; and such check or share draft shall be made payable to the City Clerk, City of Parkersburg, Iowa, as a security that if awarded a contract, the Bidder will enter into a contract at the prices bid and furnish the required performance and payment bond and certificate of insurance. The certified or cashier's check or certified share draft may be cashed, or the bid bond redeemed, if the Contractor fails to enter into a contract, or fails to provide a certificate of insurance within ten (10) days after the acceptance of his proposal by resolution of Council. No bidder may withdraw a bid within sixty (60) days after the date set for opening bids. The City reserves the right to reject any and all bids, to waive informalities and technicalities. The Council reserves the right to defer acceptance of any proposal for a period not to exceed sixty (60) calendar days after the date bids are to be received. If awarded, one (1) contract will be awarded to the lowest responsible, responsive bidder for Base Bid with or without alternates based on the amount of work, type of materials selected by the City based, and lifecycle costs. Liquidated damages in the amount of $1,000.00 per calendar day will be assessed for each day that work remains uncompleted after the deadline set below. Contractor shall begin work within ten days of the Owner's Notice to Proceed, and work shall proceed continuously until completed. Work must be completed by December 31st, 2025. The successful bidder shall furnish a Performance Bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operation of the Contractor. In addition, the bond shall guarantee against defects in materials or workmanship for a period of two years after completion and acceptance by the City. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa and to Iowa domestic labor to the extent lawfully required under Iowa statues. Payments will be made to the Contractor based on monthly estimates in amounts equal to ninety-five percent (95%) of the contract value of the work completed, excluding materials and equipment delivered to the job site during the preceding calendar month, and will be based upon an estimate prepared on the twenty-fifth (25th) day of each month by the Contractor, subject to the approval of the Engineer. Such monthly payment will in no way be construed as an act of acceptance for any part of the work partially or totally completed. The balance of the five percent (5%) due the Contractor will be paid not earlier than thirty-one (31) days from the date of final acceptance of said work by the City, subject to the conditions and in accordance with the provisions of Chapter 573 of the Code of Iowa, as amended. No such partial or final payment will be due until the Contractor has certified to the City Clerk that the materials, labor, and services involved in each estimate have been paid for in accordance with the requirements stated in the specifications. Payments shall be made in cash from funds on hand; money from the sale of Bonds; or other monies which can be legally used for this work Question Deadline 04/23/2025
Award
Water / Sewer
$1,119,543.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 28, 2025
May 28, 2025
Wemple St & Lincoln St, Parkersburg, IA
Related To This Project
Parkersburg, IA
Bid Date: May 05 2025
Parkersburg, IA
Bid Date: Aug 04 2025
Parkersburg, IA
Bid Date: Dec 16 2025
Parkersburg, IA
Bid Date: Sep 03 2024
Parkersburg, IA
--
Parkersburg, IA
--
Parkersburg, IA
Bid Date: Jul 10 2024
Parkersburg, IA
Bid Date: May 06 2024
Parkersburg, IA
Bid Date: Feb 22 2024
Parkersburg, IA
Bid Date: Dec 21 2020
Parkersburg, IA
Bid Date: Oct 19 2023
Parkersburg, IA
Bid Date: Sep 08 2020
Parkersburg, IA
Bid Date: Jan 18 2023
Parkersburg, IA
Bid Date: May 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
