Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 12, 2025 at 8:00 PM
Updated June 13, 2025
Renovation of an educational facility in Murray, Kentucky. Completed plans call for the renovation of a educational facility.
This project is for Central Plant #2 Chiller Replacement. Project consists of the complete renovation and upgrade of the boiler burner assemblies serving Boiler #1 and Boiler #2 respectively, consistent in form and function to the current installation. In addition, the intent is to suitable re-install and integrate the existing boiler monitoring and feedwater systems with the new boiler burner assemblies to successfully monitor and control the entire boiler system. Substantial completion is September 15, 2025. Final Completion is October 15, 2025. All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instruction to Bidders and/or General Conditions. Questions about obtaining plans and specifications may be directed to Beth Ward @ lward10@murraystate.edu. Murray State University, Procurement Services, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served. The overarching goal of the project is to effect the complete renovation and upgrade of the boiler burner assemblies serving Boiler #1 and Boiler #2 respectively, consistent in form and function to the current installation Demolition Scope of Work 1. Demolish and legally dispose of / salvage all existing boiler burner assemblies and all associated appurtenances. All existing boiler monitoring and feedwater systems and associated specialties will be retained for reuse. 2. De-energize, demolish and legally dispose of all services / infrastructure rendered obsolete as a function of the project and / or as required by Authorities Having Jurisdiction back to the point of origination. This would include, but not be limited to electrical and special systems conductors and raceways. 3. All existing combustion and flue gas assemblies and associated appurtenances shall be retained for reuse to the extent practical. Installation Scope of Work 1. Contractor shall provide all necessary protection to mitigate damage to existing infrastructure and finishes and shall be responsible for suitably repairing any damage to the same which occurs as a result of the Contractor's Work. 2. Furnish and install two (2) nominal 300 HP boiler burner assemblies (Limpsfield LCNP36 or approved equal) with options and accessories: a. Burner front and rear section finished in gloss powder coat b. Sympathetic designed transitional duct to bring air from forced draft fan to burner inlet c. Removable aluminum burner rear back ring/sight glass d. Autoflame gas and air servo motors and spillback control valves e. Air pressure switch f. Single outlet ignition transformer g. Ignition electrode h. Gas pilot injector assembly i. Autoflame end view UV scanner (self-check) j. Stainless Steel diffuser k. Stainless Steel blast tube end cone l. Fully wired burner control panel mounted directly to burner complete with Autoflame Mk 8 Touch screen with the following features: i. Micro Modulation-Fuel/Air Ratio Control ii. UV Flame Safeguard iii. Precise Target Setpoint Control iv. Lead Lag Control for both Steam and Hot Water v. MK8 touch screen with 7 channels m. Forced draft fan variable frequency drive
Award
Educational
$299,900.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 25, 2025
June 4, 2025
To Be Determined, Murray, KY
Related To This Project
Murray, KY
Bid Date: May 13 2025
Murray, KY
Bid Date: May 05 2025
Murray, KY
Bid Date: May 12 2020
Murray, KY
Bid Date: May 20 2025
Murray, KY
Bid Date: May 22 2025
Murray, KY
Bid Date: May 22 2025
Murray, KY
Bid Date: Jun 25 2025
Murray, KY
Bid Date: Jun 25 2025
Murray, KY
Bid Date: Apr 30 2025
Murray, KY
Bid Date: Apr 28 2025
Murray, KY
Bid Date: Apr 15 2025
Murray, KY
Bid Date: Apr 16 2025
Murray, KY
Bid Date: Mar 13 2025
Murray, KY
Bid Date: Feb 17 2025
Murray, KY
Bid Date: Mar 07 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
