EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 2, 2025 at 8:00 PM

Updated June 3, 2025

Site work and new construction of a transportation facility in Barnstable, Massachusetts. Working plans call for the construction of a transportation facility; and for site work for a transportation facility.

Project has been cancelled FY25 Construct Terminal Apron Hardstands Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Questions Due Date: Apr 16th 2025, 12:00 PM EDT Online Portal The Town of Barnstable's Representative for this project and Owner's Project Manager will be Chris Bostwick, C.M., Senior Project Manager, Airfield Compliance Officer, Cape Cod Gateway Airport, for the Town of Barnstable. Once the project contract is signed, all project questions, shop drawings, samples and requirements for approvals shall be directed to: Town of Barnstable Attn: Michael Nelson, Interim Airport Manager Cape Cod Gateway Airport 480 Barnstable Road Hyannis, MA 02601 k. The purpose of this project is to construct new P-501 Portland Cement Concrete (PCC) hardstands at the terminal apron. This PCC will be reinforced and include a reliever slab around its perimeter. Other construction itemsinclude the demolition and removal of the existing asphalt pavement and underlying base course materials, unclassified excavation, asphalt pavement, new pavement markings, and subsequent PCC Joints. The work to be completed under this contract includes the furnishing of all labor, equipment, materials, tools, and incidentals necessary to complete all work in accordance with the provisions of the Contract; the Contract Plans, the Contract Specifications, Contract Addenda, environmental permit conditions and as may be directed by the Engineer. All materials to construct and to be installed on this project shall be new and are subject to the "Buy American Clause".

Final Planning

Transportation Terminals

$822,417.00

Public - City

New Construction, Site Work

17

11

8

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Mercantile and Service Equipment
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Paving Specialties, Pavement Markings
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Manufacturing Equipment, Dies and Molds, Molds

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
108
Bidding Soon
1,903
All Active Projects
832
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

June 3, 2025

img_map_placeholder

To Be Determined, Barnstable, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.