Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 15, 2025 at 8:00 PM
Updated July 16, 2025
Site work for a water / sewer project in Spearville, Kansas. Completed plans call for site work for a water / sewer project.
Work consists of: The major items of work include water line improvements: 339 linear feet 4" DR18 C900 Certa-Lok Pipe, 4268 linear feet 6" DR18 C900 Certa-Lok Pipe, 1 each 4" Gate Valve w/ Valve Box, 21 each 6"Gate Valve w/ Valve Box, 8 each Waterline Connection, 6 each Fire Hydrant Assembly (3-Way), 3093 linear feet of 1" Service Line w/ Tracer Wire, 46 each 1" Service Connection (incl. Saddle, Corp. Stop & Fittings), 72 linear feet of 2" Service Line w/ Tracer Wire, 1 each 2" Service Connection (incl. Saddle, Corp. Stop & Fittings), 312 linear feet of 3" Service Line w/ Tracer Wire, 1 each 3" Service Connection (incl. Saddle, Corp. Stop & Fittings), 6 each Monitoring Station for Tracer Wire, 8 each Waterline Abandonment, 8 each Valve and Valve Box Abandonment, 5 each Fire Hydrant Removal, 22 each Waterline Connection Pavement Patching, 46 each Service Line Pavement Patching, and other appurtenances. The Issuing Office for the Bidding Documents is: EBH & Associates, P.A., 123 S. Main St., Cimarron, KS 67835 Tel: (620) 855-7030; E-Mail: JoelK@EBHengineering.com. Question Deadline 05/08/2025 Questions about the meaning or intent of the Bidding Documents shall be directed to Owner Owner reserves the right to waive irregularities and to reject bids. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof.
Award
Water / Sewer
$685,583.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2025
July 14, 2025
Multiple Locations, Spearville, KS
Related To This Project
Spearville, KS
Bid Date: Feb 27 2026
Spearville, KS
Bid Date: Mar 05 2026
Spearville, KS
Bid Date: Dec 14 2022
Phillipsburg, KS
Bid Date: Apr 18 2025
Phillipsburg, KS
Bid Date: Apr 18 2025
Topeka, KS
Bid Date: Apr 29 2025
Kansas City, KS
Bid Date: May 07 2025
Topeka, KS
--
Abilene, KS
Bid Date: Apr 29 2025
Olathe, KS
Bid Date: Jul 22 2025
Topeka, KS
Bid Date: Apr 30 2025
Florence, KS
Bid Date: Apr 15 2025
Ellsworth, KS
Bid Date: May 01 2025
Wichita, KS
Bid Date: Apr 02 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
