Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 8, 2025 at 8:00 PM
Updated July 9, 2025
Renovation of a clubhouse / community center in Taylor, Michigan. Completed plans call for the renovation of a clubhouse / community center.
Reference Number 0000383140 Description The City of Taylor is seeking qualified contractors to provide all labor and materials necessary for the complete replacement of the boiler system at the Ford Senior Center, located at 6750 Troy St, Taylor, MI 48180. This project includes the installation of two (2) Lochinvar Knight KHB285N boilers, associated pumps, valves, venting, and control connections. All work shall be performed in accordance with the detailed specifications outlined in this solicitation. A mandatory pre-bid meeting will be held on-site to review project expectations and address any contractor questions. All proposals must include required bonding and warranty documentation as outlined below. This is a CDBG federally funded project and is subject to the Davis-Bacon Act and Federal Prevailing Wage Requirements. All contractors and subcontractors are required to fully review, understand, and comply with the labor standards and wage rates outlined in the attached "Davis-Bacon Act" document. This document will be provided as an attachment and must be reviewed prior to submitting a bid. Question Acceptance Deadline 04/25/2025 05:00 PM EDT Questions are submitted online No Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Federally Funded - Insurance Required - License Required - Prevailing Wage Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 5 % Provide all labor and material to replace boiler system with two (2) Lochinvar Model KHB285N Knight boilers Remove/Replace/Reinstall main pump for proper operation Install (4) new isolation valves, one new temperature sight glass thermometer Capture existing Glycol in the system and refill with existing Glycol and top off with customer supplied Glycol Reconnect all existing electrical wiring Reconnect all existing control wiring Reconnect all existing natural gas Check, test and startup of new boilers and pumps Clean all debris from job site Side wall PVC venting included Perform CSD-I testing on newly installed boilers
Award
Clubhouse / Community Centers
$64,734.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 13, 2025
June 12, 2025
6750 Troy St, Taylor, MI
Related To This Project
Taylor, MI
Bid Date: May 09 2025
Taylor, MI
Bid Date: May 02 2025
Taylor, MI
Bid Date: May 14 2025
Taylor, MI
Bid Date: Jun 02 2025
Taylor, MI
Bid Date: Aug 12 2025
Taylor, MI
Bid Date: Jun 26 2025
Taylor, MI
Bid Date: Jun 26 2025
Taylor, MI
Bid Date: Jul 10 2025
Taylor, MI
Bid Date: May 20 2025
Taylor, MI
Bid Date: May 07 2025
Taylor, MI
Bid Date: May 15 2025
Taylor, MI
Bid Date: Mar 31 2025
Taylor, MI
Bid Date: Apr 21 2025
Taylor, MI
Bid Date: Mar 21 2025
Taylor, MI
Bid Date: May 02 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
