BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2025 at 8:00 PM

Updated July 9, 2025

Renovation of a clubhouse / community center in Taylor, Michigan. Completed plans call for the renovation of a clubhouse / community center.

Reference Number 0000383140 Description The City of Taylor is seeking qualified contractors to provide all labor and materials necessary for the complete replacement of the boiler system at the Ford Senior Center, located at 6750 Troy St, Taylor, MI 48180. This project includes the installation of two (2) Lochinvar Knight KHB285N boilers, associated pumps, valves, venting, and control connections. All work shall be performed in accordance with the detailed specifications outlined in this solicitation. A mandatory pre-bid meeting will be held on-site to review project expectations and address any contractor questions. All proposals must include required bonding and warranty documentation as outlined below. This is a CDBG federally funded project and is subject to the Davis-Bacon Act and Federal Prevailing Wage Requirements. All contractors and subcontractors are required to fully review, understand, and comply with the labor standards and wage rates outlined in the attached "Davis-Bacon Act" document. This document will be provided as an attachment and must be reviewed prior to submitting a bid. Question Acceptance Deadline 04/25/2025 05:00 PM EDT Questions are submitted online No Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Federally Funded - Insurance Required - License Required - Prevailing Wage Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 5 % Provide all labor and material to replace boiler system with two (2) Lochinvar Model KHB285N Knight boilers Remove/Replace/Reinstall main pump for proper operation Install (4) new isolation valves, one new temperature sight glass thermometer Capture existing Glycol in the system and refill with existing Glycol and top off with customer supplied Glycol Reconnect all existing electrical wiring Reconnect all existing control wiring Reconnect all existing natural gas Check, test and startup of new boilers and pumps Clean all debris from job site Side wall PVC venting included Perform CSD-I testing on newly installed boilers

Award

Clubhouse / Community Centers

$64,734.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
536
Active Projects
320
Bidding Soon
2,696
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 12, 2025

Project location map

6750 Troy St, Taylor, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.