Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 21, 2025 at 8:00 PM
Updated May 22, 2025
Site work for a water / sewer project in San Antonio, Texas. Working plans call for site work for a water / sewer project.
Estimated Bid advertisement in 1st quarter of 2026 The SMCWRC is the largest of the three (3) wastewater treatment plants San Antonio Water System (SAWS) owns and operates, and is located at 3495 Valley Rd, San Antonio, TX 78221. The plant has been in operation since 1987. Estimated Construction start in Mid 2026 This project is the first phase of the 2020 Wastewater Facilities Master Plan to rehabilitate or replace aging equipment and infrastructure at SMCWRC. Phase 1 of the planned improvements will address critical rehabilitation needs at secondary treatment, tertiary filtration, and disinfection process areas. The scope of this project includes: Replacement of sludge collection mechanisms in Stage 1 settling tanks Replacement of Stage 2 return activated sludge (RAS) screw pump assemblies Replacement of tertiary filter cloth media units and fiberglass filter frames Concrete structure repairs and protective coatings within focus areas Replacement of sluice gates, scum skimmers, piping, pumps, and associated equipment in the disinfection area Replacement of existing digestion boiler, boiler canopy decking, and associated improvements Demolition of abandoned fuel storage tank Electrical and Supervisory Control and Data Acquisition (SCADA) improvements to secondary treatment, tertiary filtration, disinfection, and boiler process areas All associated site civil, mechanical, structural, electrical, and I&C work for this rehabilitation Please submit questions and/or comments by May 14, 2025, at 4:00 PM (CDT). Answers to the questions will be posted to the web site by May 21, 2025, at 4:00 PM (CDT). To obtain additional information about the project, ask questions, or provide comment, contact Yvonne Rodriguez, Contract Administrator, at 210-233-3105 or via email at yvonne.rodriguez@saws.org. Please complete the attached RSVP form and provide to Yvonne Rodriguez, Contract Administrator via email to yvonne.rodriguez@saws.org by the RSVP deadline. Attendees shall RSVP no later than May 1, 2025 by 10:00 AM (CDT). There is a limit of two (2) team members per firm.
Final Planning
Water / Sewer
$50,000,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2025
June 30, 2026
3495 Valley Rd, San Antonio, TX
Related To This Project
San Antonio, TX
--
San Antonio, TX
Bid Date: Aug 07 2025
San Antonio, TX
--
San Antonio, TX
Bid Date: Apr 08 2020
San Antonio, TX
Bid Date: Oct 09 2020
San Antonio, TX
Bid Date: Apr 29 2025
San Antonio, TX
--
San Antonio, TX
Bid Date: May 02 2025
San Antonio, TX
--
San Antonio, TX
Bid Date: Jun 05 2025
San Antonio, TX
Bid Date: Oct 22 2025
San Antonio, TX
Bid Date: May 09 2025
San Antonio, TX
--
San Antonio, TX
Bid Date: May 23 2025
San Antonio, TX
Bid Date: May 06 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
