BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 21, 2025 at 8:00 PM

Updated May 22, 2025

Site work for a water / sewer project in San Antonio, Texas. Working plans call for site work for a water / sewer project.

Estimated Bid advertisement in 1st quarter of 2026 The SMCWRC is the largest of the three (3) wastewater treatment plants San Antonio Water System (SAWS) owns and operates, and is located at 3495 Valley Rd, San Antonio, TX 78221. The plant has been in operation since 1987. Estimated Construction start in Mid 2026 This project is the first phase of the 2020 Wastewater Facilities Master Plan to rehabilitate or replace aging equipment and infrastructure at SMCWRC. Phase 1 of the planned improvements will address critical rehabilitation needs at secondary treatment, tertiary filtration, and disinfection process areas. The scope of this project includes: Replacement of sludge collection mechanisms in Stage 1 settling tanks Replacement of Stage 2 return activated sludge (RAS) screw pump assemblies Replacement of tertiary filter cloth media units and fiberglass filter frames Concrete structure repairs and protective coatings within focus areas Replacement of sluice gates, scum skimmers, piping, pumps, and associated equipment in the disinfection area Replacement of existing digestion boiler, boiler canopy decking, and associated improvements Demolition of abandoned fuel storage tank Electrical and Supervisory Control and Data Acquisition (SCADA) improvements to secondary treatment, tertiary filtration, disinfection, and boiler process areas All associated site civil, mechanical, structural, electrical, and I&C work for this rehabilitation Please submit questions and/or comments by May 14, 2025, at 4:00 PM (CDT). Answers to the questions will be posted to the web site by May 21, 2025, at 4:00 PM (CDT). To obtain additional information about the project, ask questions, or provide comment, contact Yvonne Rodriguez, Contract Administrator, at 210-233-3105 or via email at yvonne.rodriguez@saws.org. Please complete the attached RSVP form and provide to Yvonne Rodriguez, Contract Administrator via email to yvonne.rodriguez@saws.org by the RSVP deadline. Attendees shall RSVP no later than May 1, 2025 by 10:00 AM (CDT). There is a limit of two (2) team members per firm.

Final Planning

Water / Sewer

$50,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2025

June 30, 2026

Project location map

3495 Valley Rd, San Antonio, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.