BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 15, 2025 at 8:00 PM

Updated May 16, 2025

Site work and paving for a road / highway in Mundelein, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Sealed bid envelopes are to be addressed as follows: "Sealed Bid Steeple Chase Golf Club 2025 Pave-ment Improvements" Mundelein Park & Recreation District Attn: Jon Karl, Director of Golf 1401 N. Midlothian Road Mundelein, Illinois 60060 The Mundelein Park & Recreation District reserves the right to reject any/or all bids and to waive any informality in the bidding Base Bid: Provide asphalt paving of Steeple Chase Golf Club Maintenance Driveway. Alternates: Provide asphalt overlay Steeple Chase Golf Club hole #12. The scope of work includes labor, materials, restoration work and disposal of waste. Location: Steeple Chase Golf Maintenance, 4 N. Chevy Chase Rd. Mundelein, IL 60060 Steeple Chase Golf Club, 200 La Vista Dr. Mundelein, IL 60060. Hole #12. Scope and Specifications: Steeple Chase Golf Club Maintenance - Driveway - Base Bid o Paving - approximately 8,200 square feet of driveway. o Remove existing aggregate, stockpile. o Excavate to new subgrade - on site placement. o Place existing stone for subgrade, 6". o Install additional CA-6 base if needed. o Install 4" HMA Binder Course o Install 2" HMA Surface Course Steeple Chase Golf Club - 2-inch paving overlay hole #12 - Including Prep Work - Alternate A o Paving Overlay - approximately 6,600 square feet of cart path. o Sawcut butt joints for smooth transition from existing asphalt to new asphalt. Approximately 20 lineal feet. o Install 2" of HMA Surface Course, Mix "D" IL-9.5 Asphalt. Installation Instructions: Construction Schedule: o Installation scheduling shall be made with the Golf Course Superintendent or agents in advance to minimize the interruption of Park District services. o Final completion shall be September 29, 2025. Restoration: o Topsoil fill will be required if the pavement is more than 1.5 inches above existing grade upon completion of paving. The contractor will install and supply high quality topsoil, seed, and seed blanket at his own expense to bring the grade to within the 1.5-inch specification. o Turf restoration will be required by the contractor if deemed necessary by the District. Please complete construction during periods of dry soil conditions. o Restoration of damage to public or private property outside the limits of this project and of all existing roads and rights-of-way and easements shall be completed in accordance with the applicable sections of the Standard Specifications for Road and Bridge Construction, Department of Transportation, State of Illinois, latest edition

Award

Roads / Highways

$45,489.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
540
Active Projects
295
Bidding Soon
3,851
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

June 2, 2025

Project location map

200 La Vista Dr, Mundelein, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.