BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 7, 2025 at 8:00 PM

Updated June 8, 2025

Site work for a road / highway in Fort Pierce, Florida. Completed plans call for site work for a road / highway.

District: 08 Counties: St Lucie, Turnpike Road Name: Toll Gantry Landscape Buffer Mp 153-154 Limits: Midpoint Project(s): 19077855246(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Days: 880 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 14 Please read the full advertisement Description: The work specified in this Contract consists of providing all labor, materials, equipment, and all incidentals necessary to relocate, install, and establish landscaping at the following location: Florida's Turnpike (SR 91) Toll Gantry Buffer from Milepost (MP) 153.0 to 154.0. The work shall include a two (2) year establishment period. No Pre-bid Conference Will Be Held for This Contract. Question Deadline 05/06/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 013 - Toll Gantry Landscape Buffer - SR 91 Question Deadline: 05/06/2025 at 5:00 PM ET Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online

Award

Roads / Highways

$394,372.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
96
Bidding Soon
1,326
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

May 23, 2025

Project location map

FL-91, Fort Pierce, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.