BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 11, 2025 at 8:00 PM

Updated June 12, 2025

Site work, paving and renovation of a mixed-use development in Reno, Nevada. Completed plans call for the renovation of a educational facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The NGEM system allows for bidders to save their work. Please make use of this capability in order to give your company enough time to review your response and upload any other documents on the day the ITB/RFP/RFQ/CMAR closes so that you do not miss the cut-off time. **Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be immediately posted online and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there. Description of Work: This is a prevailing wage project. Construction project to replace 150 linear feet of piping that provides HTHW to the Orvis Building and repair, repave and change the layout of the Silver 2 Parking Area between Mackay Science and Orvis Building. Special Considerations: Schedule of Values due at Intent of Award with breakdown of two separate project costs. Fall Semester begins 8/25/2025. Coordinate with UNR construction project manager to maintain ADA access to Mackay Science and Orvis Building. oordinate High Temp Hot Water shutdown with UNR HVAC shop and construction project manager. High Temp Hot Water pipe welding per project specification required. Experience with Gilsulate insulation installation required. Provide examples of past work with Gilsulate. Estimated Cost Range: $1,130,000 to $1,330,000 Liquidated Damages: $1,000/day Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, Workers' Compensation, Contractors Pollution Liability, and Builders Risk Insurance will be required. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth at online. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "May 26, 2025" and shall be fully complete by "August 22, 2025." *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Educational

$1,044,044.00

Public - State/Provincial

Paving, Renovation, Site Work

24

9

2

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
28
Bidding Soon
388
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

June 9, 2025

Project location map

1768 Evans Ave, Reno, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.