BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2025 at 8:00 PM

Updated December 20, 2025

Site work and paving for a mixed-use development in Lakeville, Minnesota. Completed plans call for site work for a playground / park / athletic field; for paving for a sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Project Involves the Construction of Curb Extensions and Installation of a Pedestrian Flasher System To Provide for a Safer Crossing of the North Creek Greenway Project On 170th Street Between Embers Avenue and Eastwood Avenue. The Majority of the Work Includes Grading, Storm Sewer, Concrete Curb and Gutter, Roadway and Trail Paving, Pedestrian Flasher System, Pavement Markings and Signage, and Restoration. Furnishing of all labor and materialsfor the construction, complete in-place, of the following approximate quantities: 970 CY Excavation 585 SY Embankment 90 CY Aggregate Base (CV) Class 5 40 TON Type SP 12.5 Wearing Course Mix (3,C) 45 TON Type SP 12.5 Non Wearing Course Mix (3,C) 60 LF 12" RCP Storm Sewer 210 LF 15" RCP Storm Sewer 300 SF 6" Concrete Walk 470 LF Concrete Curb & Gutter Design B424 1 SYS Pedestrian Crosswalk Flasher System Special 1,600 LF Pavement Markings Direct questions about this Project, including pre-bid questions, to Jonathan Nelson at 952-985-4502 and jnelson@lakevillemn.gov. No bids will be considered unless accompanied by a certified check, or bid bond made payable to the City of Lakeville for five percent (5%) of the amount bid, to be forfeited asliquidated damagesin the event that the bid be accepted and the bidder fail to enter promptly into a written contract and furnish the required bond. Final completion for the project, including all punch list items shall be completed by August 29, 2025. Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of Contractor's obligations under the Contract. These bonds must remain in effect until one year after the date when final payment becomes due The Owner reserves the right to reject any and all Bids, waive any informalities in bidding or to accept the Bid or Bids, which best serve the interests of the Owner. No bids may be withdrawn for a period ofsixty (60) daysfrom the date of opening of bids. The City of Lakeville reservesthe right to reject any or all bids. The City Council Reserves the Right to Reject Any and All Bids. No Bid May Be Withdrawn for a Period Of 60 Days

Award

Playgrounds / Parks / Athletic Fields

$277,566.00

Public - City

Paving, Site Work

44

14

6

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
0
Bidding Soon
880
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

June 5, 2025

Project location map

170th St W, Lakeville, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.