Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 5, 2025 at 8:00 PM
Updated June 6, 2025
Renovation of an educational facility in Troy, Missouri. Completed plans call for the renovation of a educational facility.
Information as to bidding instructions and requirements for procuring bidding documents may be obtained from the Architect. Not less than the prevailing hourly wage rates, as determined by the State of Missouri, Division of Labor Standards, shall be paid all workers employed on this project. The Board of Education intends to award a contract to the lowest responsible bidder complying with the terms of the letting. However, the Board of Education reserves the right to reject any or all bids; to reject any part of a bid; to accept any bid which it deems to be in its best interest; to advertise for and solicit new bids; and, to waive any informalities or technicalities in the bid requirements and specifications. The Owner reserves the privilege of extending the time of receiving bids. In the event the time is extended, all holders of bidding documents will be informed simultaneously by written instructions issued through the Architect's office. By submitting a bid, the Bidder agrees that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receiving bids. It is required that all contractors submit all of the project submittals within One Hundred and Fifty (150) calendar days after Notice to Proceed (including any proper extension granted by the Owner). This process will assist with expediting ordering of materials. 8.1 Each General Contractor shall file with his bid a cashier's check in the amount of five percent (5%) of the total bid. A. In lieu of a cashier's check, a surety company bid bond in the minimum amount of five percent (5%) of the total bid will be acceptable. The bond MUST be on AIA Form A310 to be accepted. The bid bond amount shall cover 5% of the TOTAL CONTRACT amount including performance and payment bond costs. B. The check or bond shall be submitted as evidence of good faith on the part of the Contractor that he will proceed into execution of a formal contract for the erection, construction, and completion of the work or such portion of the work as may be determined by the Owner. Check shall be made payable to the Owner. C. Bid bond or cashier's check of the unsuccessful bidders will be returned after award of contract has been made, and that of the successful bidder will be returned after execution of the Contract. Except that, if the successful bidder refuses to enter into a contract with the Owner in substantially the same form as contained herein, the Owner shall be entitled to retain the bidder's bid bond. Question Deadline 04/22/2025 at 5:00 PM CT Requests for Substitutions of Materials Must Be Made in Writing. Requests Submitted After That Date Will Not Be Considered.
Award
Educational
$224,900.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 29, 2025
June 2, 2025
1190 Old Cap Au Gris Rd, Troy, MO
Related To This Project
Troy, MO
Bid Date: May 19 2025
Troy, MO
Bid Date: Aug 12 2025
Troy, MO
Bid Date: Aug 21 2025
Troy, MO
Bid Date: Aug 21 2025
Troy, MO
Bid Date: Sep 04 2025
Troy, MO
Bid Date: Dec 12 2025
Troy, MO
Bid Date: Oct 17 2025
Troy, MO
Bid Date: Apr 22 2025
Troy, MO
Bid Date: Feb 25 2025
Troy, MO
Bid Date: Feb 25 2025
Troy, MO
Bid Date: Mar 04 2025
Troy, MO
Bid Date: Mar 04 2025
Troy, MO
Bid Date: Mar 04 2025
Troy, MO
Bid Date: Feb 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
