BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 2, 2025 at 8:00 PM

Updated June 3, 2025

Site work and new construction of a mixed-use development in Hardeeville, South Carolina. Completed plans call for the construction of a 12,000-square-foot, one-story above grade educational facility; and for site work for a educational facility.

This Request For Proposal (RFP) is issued by Royal Live Oaks Academy for the design and construction of School Pre-Engineered Gymnasium structure with two classrooms and Third Party Inspection Agencies. The scope of this project includes the design, engineering, and construction of a Pre-Engineered Gymnasium structure with two classrooms. The facility should be designed to meet all local, zoning laws, safety regulations and South Carolina Department of Education Office of School Facilities, and should be energy-efficient and cost-effective. The project will be delivered using a Design-Build approach, where the selected contractor will be responsible for both the design and construction of the facility. Key Project Components Pre-Engineered Gymnasium: Approximate size: Approximately 12,000 sq. ft. Ceiling height: At least 30 ft. Structural components: Steel framing, pre-engineered roof system Floor type: Pricing choice for each: hardwood and synthetic sports flooring Lighting: Energy-efficient LED lighting with proper illumination levels for sporting events Restrooms for both male and female HVAC: Efficient heating and cooling systems for occupant comfort Other features: Bleachers (Retractable), scoreboards, basketball hoops, and storage areas Motorized Gym Divider Volleyball Court Support, Floor receptacle to receive the volleyball net poles Floor layout and lining to support both Volleyball and Basketball Courts Security System install and coordination with current system of main building. Classrooms: Size: Approximately 750 sq. ft. each Number: 2 classrooms to accommodate 30 students in each. Features: Drywall, insulation, ceiling systems, lighting, HVAC, power outlets, and windows Use: These classrooms will be used for educational purposes and can also serve as multipurpose rooms. These classrooms should be open to a hallway. Site: Provide Site Plans and layout that integrate the new construction with existing school infrastructure. This includes addressing the placement of utilities, accessibility, and other relevant factors. Site preparation, including grading, excavation, utilities, paving, drainage, and landscaping Sidewalks, and access routes to main school building. Lobby area: Leading to both hallway to classrooms. Restrooms and Gym Entry. Third Party Inspections: Pre-construction Inspections: Conduct inspections of the site prior to construction to ensure it is ready for building. Quality Control and Appliance: Provide ongoing third-party inspections during construction to ensure compliance with approved plans, building codes, safety regulations, and quality standards. Final Inspections: Upon completion, provide a final inspection to verify that the project is completed to specification and within safety requirements. For this project an Architect/Engineer/Construction Team is required Contractor Selection: June 16, 2025 Design Phase Completion: August 29, 2025 Please direct any inquiries or requests for clarification to Brian.Morse@rloacs.org.

Post-Bid

Educational

$3,300,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
42
Bidding Soon
632
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

January 2, 2026

Project location map

400 John Smith Rd, Hardeeville, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.