BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2025 at 8:00 PM

Updated June 11, 2025

Renovation of an educational facility in Chesterfield, Virginia. Working plans call for the renovation of a educational facility.

** Project canceled. Re-bid details to follow. All spaces will be occupied during regular school hours. Construction debris must be removed, and work area cleaned at the end of each work period. School hours are as follows: a. Evergreen Elementary: 9:25 A.M. 3:55 P.M. Monday-Friday b. O.B. Gates Elementary: 9:10 A.M. 3:55 P.M. Monday-Friday From June 23- July 17 School hours are as follows a. Evergreen Elementary- 7:30 A.M. -11:30 A.M. Monday-Thursday b. O.B. Gates Elementary- 7:30 A.M. -11:30 A.M. Monday-Thursday Work hours shall be as follows: a. When School is in, 1 hour after school ends until 1:00 A.M. Monday through Friday b. When School is out, 7:00 A.M. 4:00 P.M. Monday through Friday CCPS observes a Thanksgiving, Winter, and Spring break during which time contractors may work 7:00 A.M. to 4:00 P.M. The dates for breaks are: November 26-30, 2025; December 22, 2025 January 2, 2026; March 30, 2026 April 3, 2026.

Final Planning

Educational

$4,812,570.00

Public - City

Renovation

84

17

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
75
Bidding Soon
1,503
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

June 30, 2025

Project location map

Multiple Locations, Chesterfield, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.