BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Site work for a playground / park / athletic field in Dunwoody, Georgia. Completed plans call for site work for a playground / park / athletic field.

**As of July 8, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The City of Dunwoody is soliciting competitive sealed bids from qualified contractors for the application of a urethane top coating also known as "roll coat" at four () City of Dunwoody Parks. Existing pour in place surfaces can be found at all four locations, consisting of three (3) playgrounds and one (1) exercise equipment area. Questions regarding bids should be directed to John Gates, Purchasing Manager, at purchasing@dunwoodyga.gov or by calling 678-382-6700, no later than 2:00 P.M. on Wednesday, April 30, 2025. The selected contractor must be able to start work within 10 calendar days after the "Notice to Proceed" is issued. The time of completion for the project is as follows: 30 available days from the "Notice to Proceed" for substantial completion and an additional 30 days for final acceptance. Award will be made to the supplier submitting the lowest responsive and responsible bid. The City reserves the right to reject any and all bids to waive technicalities, and to make an award deemed in its best interest. Bids may be split or awarded in entirety. The City reserves the option to negotiate terms, conditions and pricing with the lowest responsive, responsible bidder(s) at its discretion. All companies submitting a bid will be notified, in writing, of award. Project Overview The City of Dunwoody is seeking qualified contractors to provide all necessary labor, materials, equipment, and expertise to apply a urethane top coating (Rollcoat) to the Pour in Place (PIP) surfaces at four (4) City parks. The objective of this project is to restore and maintain the safety, appearance, and functionality of the PIP surfaces through a professional application of the Rollcoat. 2. Scope of Work The successful contractor shall be responsible for the following: 2.1 Site Locations and Estimated Square Footage 1. Brook Run Park, Playground Location: 4770 North Peachtree Road, Dunwoody, GA 30338 Estimated Square Footage: 15,700 SF 2. Windwood Hollow Park, Playground Location: 4865 Lakeside Drive, Dunwoody, GA 30338 Estimated Square Footage: 7,000 SF 3. Georgetown Park, Playground Location: 4400 Dunwoody Park Drive, Dunwoody, GA 30338 Estimated Square Footage: 4,200 SF 4. Pernoshal Park, Exercise Equipment Areas Location: 4575 North Shallowford Road, Dunwoody, GA 30338 Estimated Square Footage: 1,600 SF

Bid Results

Playgrounds / Parks / Athletic Fields

$80,850.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
325
Active Projects
198
Bidding Soon
2,279
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2025

May 22, 2025

Project location map

To Be Determined, Dunwoody, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.