Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 9, 2025 at 8:00 PM
Updated June 11, 2025
Site work for a road / highway in Frankfort, Kentucky. Completed plans call for site work for a road / highway.
Ref. #: 741516 - 1 Letcher County Fiscal Court is requesting bids for shoulder repair services - All requested information must be filled out to be considered a valid bid. - Work is expected to be completed within 60 days of contract award. - Work will follow all best construction practices. All work shall conform to Division 400 of the KY Department of Highways 2019 Standard Specifications for Road and Bridge Construction, which can be found at http://transportation.ky.gov/Construction/Pages/Kentucky-Standard-Specifications.aspx - For Ditching Projects or culvert clean out projects. Earthen Material from Ditching or Culvert Clean Out may be worked into surrounding embankment at appropriate angles, especially in locations under which Channel Lining will be installed. Remaining Sediment or Earthen Material must be hauled to a government borrow pit (location/tickets/photos must be included on invoice) or hauled to a landfill. Debris must be hauled to a landfill. Landfill tickets are required to be submitted with an invoice. - Invoices must include at least 4 Photos of "Before" and 4 Photos "After" work completion. Photos must be taken with an app (such as Solocator or GPS Camera) that displays the GPS (and preferably road name) and date. - If rock/aggregate or fill material is supplied as part of this work, the Invoice must list the quarry location of aggregate or the source location of the fill. If rock/aggregate is supplied from a third party, must provide documentation from the third party of the original location of the aggregate or fill. Third party documentation must be signed and submitted on third party letterhead. - This work is for a specific site/repair with quantities listed on a FEMA grant; as such documentation supporting the quantities must be provided (e.g. quarry tickets, or load counts/truck capacities). Invoices must list the haul off location of any debris, spoils, or waste (example: permitted landfill, recycling location, or road dept for reuse). - Payment will follow only after work is completed, all documentation is received from the Contractor and reconciled by the Grants Management Team, and after approval by the Fiscal Court. (Documentation to include items such as before/after photos (always required), quarry documentation, quantity documentation, and documentation of disposal). - Successful bidders, assigns, subcontractors must be compliant with all applicable Federal, State and Local laws. - Letcher County reserves the right to accept or reject any and all bids. Letcher County reserves the right to seek clarification from bidders. - Letcher County Fiscal Court is an Equal Opportunity Employer and encourages all qualified businesses to respond to this request, including minority, women, veteran owned businesses, as well as hub-zone businesses. - Work can not start until the contract agreement is fully executed and the contractor has made contact with Letcher County Matt Amburgey at (606) 595-8710 to schedule work and work supervision/inspection
Post-Bid
Roads / Highways
$200,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2025
May 19, 2025
Multiple Locations, Frankfort, KY
Related To This Project
Frankfort, KY
Bid Date: May 07 2025
Frankfort, KY
Bid Date: Jun 24 2025
Frankfort, KY
Bid Date: May 13 2025
Frankfort, KY
Bid Date: May 27 2025
Frankfort, KY
Bid Date: May 21 2025
Frankfort, KY
Bid Date: May 22 2025
Frankfort, KY
Bid Date: Jun 04 2025
Frankfort, KY
Bid Date: May 27 2025
Frankfort, KY
Bid Date: Apr 17 2025
Frankfort, KY
Bid Date: Apr 17 2025
Frankfort, KY
Bid Date: Apr 17 2025
Frankfort, KY
Bid Date: Jul 10 2025
Frankfort, KY
Bid Date: Jun 03 2021
Frankfort, KY
Bid Date: Apr 24 2025
Frankfort, KY
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
