BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated September 19, 2025

Site work for a water / sewer project in Sioux City, Iowa. Completed plans call for site work for a water / sewer project.

Work includes light cleaning, invert repairing and patching, and spray applied pipe lining of 250 linear feet of 60-inch, and 750 linear feet of 72-inch storm sewer. Each bid must be made on a form furnished by the City and must be accompanied by a bid bond, a cashier's check or certified check of an Iowa bank or a bank chartered under the laws of the United States, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to ten percent (10%) of the amount of the bid, made payable to the City Treasurer of the City of Sioux City, Iowa. The check or draft may be cashed by the City Treasurer as liquidated damages in the event the successful bidder fails to enter into a contract within the ten (10) days after notice of award and post bond satisfactory to the City ensuring the faithful fulfillment of the contract. This project has an early start date of June 3, 2025, and a late start date of September 2, 2025. Work shall be completed within 40 Working Days. Question Deadline 04/22/2025 All questions about the meaning or intent of the bidding documents shall be submitted to the Engineer in writing A public hearing will be held before the Sioux City, City Council in the Council Chambers, Room 504, City Hall, 405 Sixth Street, Sioux City, Iowa, on April 28, 2025 commencing at 4:00 P.M., Local Time, on the proposed plans, specifications, form of contract, and estimate of cost in the amount of $445,000.00 (the construction documents) for the construction of the 12 th Street and Floyd Boulevard Storm Sewer Repair Project in Sioux City, Iowa. At said hearing, any interested person may appear and file objections to the proposed plans, specifications, contract, or estimated cost of the public improvement. The public improvement project is located at the intersection of 12 th Street and Floyd Boulevard and includes light cleaning, invert repairing and patching, and spray applied pipe lining of 250 linear feet of 60-inch, and 750 linear feet of 72-inch storm sewer.

Award

Water / Sewer

$445,000.00

Public - City

Site Work

3

8

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
55
Bidding Soon
530
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

June 3, 2025

Project location map

12th Street and Floyd Boulevard, Sioux City, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.