Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 27, 2025 at 8:00 PM
Updated August 28, 2025
Renovation of a power facility in Anaheim, California. Completed plans call for the renovation of a power facility.
As of August 27, 2025, the project has concluded bidding. A design/build award will be announced on November 18, 2025. Construction is expected to start in 2027 and will finish in June of 2029. *The closed solicitation has been included below for reference: City of Anaheim Department of Public Utilities, in partnership with the Department of Public Works (hereinafter referred to as "City"), is soliciting Statements of Qualifications (RFSQ) from Design-Build Entities (DBE) to design and construct the Vermont Substation Expansion project to serve the community of Anaheim. The issuance of this RFSQ with the Prequalification Questionnaire is the first step in the process. City will score and rank all submittals. The DBEs with the five (5) highest scores will be eligible to advance to the second step in the process (the issuance of a Design-Build Request for Proposal). Construction is scheduled to be completed by July of 2029. Respondents are invited to review the information and to submit their Statement of Qualifications (SOQ) in accordance with the criteria established in this RFSQ. Written questions regarding this RFSQ must be received by the City no later than ten days prior to the due date. Questions may then be responded to by written amendment to this document. Oral statements or instructions shall not constitute an amendment to the RFSQ. Question Submission Deadline: May 27, 2025, 2:00pm Project Contact Samantha Bahena Assistant Engineer 200 S. Anaheim Blvd. Anaheim, CA 92805 Email: sbahena@anaheim.net Phone: (714) 765-4937 The City reserves the right to cancel, in part or in its entirety, this RFSQ or the RFP, including but not limited to selection schedule, submittal date, and submittal requirements. If the City cancels in part or its entirety the RFSQ or the RFP, all prospective Respondents, or the Most Qualified Respondents in the case of the RFP, will be notified in writing by the City.
Post-Bid
Power Plant
$33,000,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 17, 2025
January 1, 2027
909 E Vermont Ave, Anaheim, CA
Related To This Project
Anaheim, CA
Bid Date: May 07 2025
Anaheim, CA
Bid Date: May 23 2025
Anaheim, CA
--
Anaheim, CA
Bid Date: May 23 2025
Anaheim, CA
Bid Date: May 22 2025
Anaheim, CA
Bid Date: Jun 12 2025
Anaheim, CA
Bid Date: Apr 22 2025
Anaheim, CA
--
Anaheim, CA
Bid Date: Apr 24 2025
Anaheim, CA
Bid Date: Apr 22 2025
Anaheim, CA
Bid Date: Jun 11 2020
Anaheim, CA
Bid Date: Apr 24 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
