BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2025 at 8:00 PM

Updated June 12, 2025

Site work for a water / sewer project in San Carlos, California. Completed plans call for site work for a water / sewer project.

**As of June 2, 2025, the project was awarded to Duke’s Root Control, Inc., with an awarded amount of $140,963.68.** The scope of work generally includes, but not limited to, applying foaming root control in the existing sanitary sewer mains and manholes. Bids are required for the entire work described herein in accordance with the instructions to bidders. The Engineers Estimate is between $130,000 and $160,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bids must be accompanied by a Proposal guarantee amounting to ten (10%) percent of the bid as described in the specifications. each proposal shall be accompanied by a bid security in the form of cash, cashiers or certified check, Said guarantee shall be forfeited to the City in case the bidder depositing the same does not, within fifteen days after written notice that the contract has been awarded to him (1) enter into a contract with the City and (2) furnish Performance and Payment Bonds as described in the specifications. Question Deadline 04/28/2025 All questions and comments regarding the plans and specifications should be directed to the Project Manager indicated below and will only be responded to if received in writing at least five (5) working days before the bid opening. Questions received after this time and date may not be addressed. City of San Carlos Public Works Department 600 Elm Street, San Carlos, CA 94070 Attention: Jessica Lee, Civil Engineering Assistant jlee@cityofsancarlos.org Telephone: (650) 802-4348 A Class A or a combination of Class C, Contractors License in addition to a Pesticide Applicator License is required for this work All work shall be diligently prosecuted to completion before the expiration of One Hundred Fifty (150) Calendar Days from the date of receipt of the Notice to Proceed. Liquidated Damages computed at the rate of Five Hundred Dollars ($500) for each calendar day beyond the specified time limit until the project is completed The City Council reserves the privilege of rejecting any and all proposals or to waive any irregularities or informalities in any proposals or in the bidding.

Award

Water / Sewer

$140,964.00

Public - City

Site Work

22

16

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
492
Active Projects
236
Bidding Soon
2,553
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

June 4, 2025

Project location map

Multiple Locations, San Carlos, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.