Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 21, 2025 at 8:00 PM
Updated May 22, 2025
Remodeling of a mixed-use development in Green Bay, Wisconsin. Completed plans call for the remodel of a educational facility.
Proposals shall be received for a single prime General Contractor for the Kitchen Remodel. The successful Bidder will be required to furnish and pay for satisfactory Performance Bond and Labor and Material Payment Bond, each in the amount of 5% of the Contract and to be executed on AIA Form A312 attached to Bid Documents. Bid Form, Bid Bond, and Form of Non-Collusive Affidavit shall be submitted with Bid. Failure to do so may be cause for rejection of bid. Copies of the above mentioned forms are in the specification book. Prime bidders must file a Proof of Responsibility Statement with the Owner not less than five (5) days prior to the date of opening bids. Bidders Proof of Responsibility Form is enclosed in specification book. Bid Description: Bids will be opened publicly and read aloud by the Owner in a room to be named later in the Administrative Offices, address above. Each bidding contractor shall be informed in writing, as to who was awarded the work. Bids will not be accepted if received after the above mentioned time. No Bid shall be withdrawn for a period of sixty (60) consecutive calendar days subsequent to the opening of Bids without the consent of the Owner. No proposal will be accepted unless accompanied by a Bid Bond or Certified Check in the amount of not less than 5 percent of the total Base Bids, payable to the Green Bay Area Public School District, Green Bay, Wisconsin, as a guarantee that if the bid is accepted, the bidder will execute and file the proposed contract and bonds within 10 days after the award of contract. A non-mandatory Pre-Bid walk through will be held on April 18, 2019 starting at 1:00pm. The Architect/Engineer will be available to answer questions. Meet at main entrance at Preble High School The Owner reserves the right to reject any or all Bids, or to waive any informality in the bidding.
Post-Bid
Educational
$400,000.00
Public - City
Remodeling
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2025
June 2, 2025
2222 Deckner Ave, Green Bay, WI
Related To This Project
Green Bay, WI
Bid Date: May 01 2025
Green Bay, WI
Bid Date: May 06 2025
Green Bay, WI
Bid Date: May 28 2025
Green Bay, WI
Bid Date: May 06 2025
Green Bay, WI
Bid Date: May 20 2025
Green Bay, WI
Bid Date: May 13 2025
Green Bay, WI
--
Green Bay, WI
--
Green Bay, WI
Bid Date: May 01 2025
Green Bay, WI
Bid Date: May 06 2025
Green Bay, WI
Bid Date: Apr 22 2025
Green Bay, WI
Bid Date: May 28 2025
Green Bay, WI
Bid Date: May 06 2025
Green Bay, WI
Bid Date: May 06 2025
Green Bay, WI
Bid Date: Apr 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
