Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 22, 2025 at 8:00 PM
Updated June 23, 2025
Site work and paving for a mixed-use development in Green Bay, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
City of Green Bay Standard Specifications and Construction Standards for Public Works Construction, 2024 Edition, 2025 Edition-Supplemental Standard Specifications, and the special provisions of this contract, all of which are on file in the City Clerk's/Treasurer's Office and the Director of Public Works Office in the Green Bay City Hall. Question Deadline 05/02/2025 ANY DESIGN QUESTIONS PERTAINING TO THIS PROJECT SHALL BE DIRECTED TO: DEPARTMENT OF PUBLIC WORKS 100 N. JEFFERSON STREET GREEN BAY, WI 54301 (920) 448-3100 The work under this Contract includes construction of approximately 9,290 linear feet of 6", 8", and 10" and 12" water main including service relays and transfers, and water main construction staking; installment of 135 linear feet of 8" sanitary sewer relay, 1641 linear feet of 8" CIPP lining, 963 linear feet of 10" CIPP lining including sanitary sewer lateral reconnections, sanitary spot repairs, and sanitary sewer manhole construction and replacement; 879 linear feet of 12", and 15", and 24" storm sewer construction including inlet leads, storm sewer laterals, storm sewer inlet construction, storm manhole removal, and storm manhole construction; 6,000 cubic yards of excavation, 4,000 linear feet of curb and gutter, 3,000 tons of crushed aggregate base course 3,000 tons of breaker run, 8,686 tons of HMA pavement, 45,668 square yards of milling surface, 4,100 square feet of concrete sidewalk and driveway reconstruction; 170 square feet of cast iron curb ramp detectable warning field, and construction staking. The work shall be let in accordance with the following Sections of the Wisconsin Statutes. 1. Section 62.15 regarding public works construction. 2. Section 779.15 regarding lien on contractors. 3. Section 66.0901(2) regarding proof of responsibility. All bidders shall provide proof of responsibility on the form furnished by the Director of Public Works and it shall be filed with the Director of Public Works not less than five (5) days prior to the time set for opening of bids. Said proof of responsibility shall not be valid if filed prior to one year of the date of opening bids. In accordance with Section 42-2 of the City of Green Bay Code of Ordinances, any corporation, firm, or individual violating Chapter 133.01 of the Wisconsin Statutes, or any subsequent amendment thereof, shall upon conviction thereof be thereby disqualified as a bidder on any City of Green Bay project for a period of three (3) years from the date of such conviction; however, nothing herein shall be interpreted to preclude such corporation, firm, or individual from completing any and all contracts he/she may already have with the City at the time of such conviction, nor shall this ordinance be applied retroactively to convictions occurring prior to the adoption and publication of this ordinance. This prohibition applies with like force to officers of convicted corporations, firms, or individuals who thereafter have business interest in new corporations or business enterprises of whatever kind or description. The City of Green Bay, Wisconsin reserves the right to reject any or all bids and to waive any informality in bidding. No bids shall be withdrawn after the opening of bids without the consent of the City of Green Bay, Wisconsin for a period of sixty (60) days after the scheduled time for closing bids. All proposals must be issued to the specific bidder by the Director of Public Works together a bid bond equal to at least five (5) but not more than ten (10) percent of the bid payable to the City of Green Bay as a guarantee that if his/her bid is accepted, he/she will execute and file the contract and a performance bond in the amount of one hundred percent (100%) of the total bid within ten (10) days after the award of the contract. Only the Proposal Pages, Bid Bond, Affidavit of Compliance, Disclosure of Ownership and any Addenda issued shall be submitted. Only Proposals submitted by firms appearing on the City of Green Bay list of plan holders will be opened. In case the successful bidder shall fail to execute such contract and performance bond, the amount of the check or bid bond shall be forfeited to the City as liquidated damages.
Award
Water / Sewer
$4,910,598.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
June 5, 2025
Multiple Locations, Green Bay, WI
Related To This Project
Green Bay, WI
Bid Date: May 20 2025
Green Bay, WI
Bid Date: May 13 2025
Green Bay, WI
--
Green Bay, WI
--
Green Bay, WI
--
Green Bay, WI
--
Green Bay, WI
Bid Date: Feb 02 2021
Green Bay, WI
Bid Date: Feb 02 2021
Green Bay, WI
Bid Date: May 28 2025
Green Bay, WI
Bid Date: May 06 2025
Green Bay, WI
Bid Date: May 01 2025
Green Bay, WI
Bid Date: May 01 2025
Green Bay, WI
Bid Date: May 01 2025
Green Bay, WI
Bid Date: May 06 2025
Green Bay, WI
Bid Date: Apr 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
